Langkah-langkah kritikal untuk mengatasi kelewatan dalam penutupan akaun muktamad

The goal of the preparation of final accounts are approval from the contractor on a fair assessment of the work that he has done and allowing the contract administrator to issue a final certificate, hence closing the project. However, delay in closing of the final account nowadays often becoming an...

Full description

Saved in:
Bibliographic Details
Main Author: Rasid, Ratna
Format: Thesis
Language:English
Published: 2017
Subjects:
Online Access:http://eprints.utm.my/id/eprint/78967/1/RatnaRasidMFGHT2017.pdf
http://eprints.utm.my/id/eprint/78967/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:106453
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.78967
record_format eprints
spelling my.utm.789672018-09-19T05:13:21Z http://eprints.utm.my/id/eprint/78967/ Langkah-langkah kritikal untuk mengatasi kelewatan dalam penutupan akaun muktamad Rasid, Ratna G70.212-70.215 Geographic information system The goal of the preparation of final accounts are approval from the contractor on a fair assessment of the work that he has done and allowing the contract administrator to issue a final certificate, hence closing the project. However, delay in closing of the final account nowadays often becoming an issue as the delay is far away from a reasonable period. Therefore the objectives of this study were to determine the critical steps and to develop an implementation model of the steps to avoid delays in the closing of the final account. The research methodology is obtaining the expert opinions by using the Interpretive Structural Modelling (ISM) approach. Seven experts were referred and their opinions were analysed using the MICMAC abd iteration process analysis. MICMAC analysis showed three critical steps to overcome delay in closing of the final account namely setting a time frame to return the certificate, making assessment, adjustment and measurement and appointing the quantity surveyor according to the appropriate criteria. Whereas, iteration process analysis showed two critical steps as the drivers to overcome delay in closing of the final account namely appointing the quantity surveyor according to the appropriate criteria and maintaining responsible employee. The findings should be benefited by the contract administrator who should focus on the critical steps that are the drivers for other steps in overcoming delay in the closing of the final account. 2017 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/78967/1/RatnaRasidMFGHT2017.pdf Rasid, Ratna (2017) Langkah-langkah kritikal untuk mengatasi kelewatan dalam penutupan akaun muktamad. Masters thesis, Universiti Teknologi Malaysia, Faculty of Geoinformation and Real Estate. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:106453
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic G70.212-70.215 Geographic information system
spellingShingle G70.212-70.215 Geographic information system
Rasid, Ratna
Langkah-langkah kritikal untuk mengatasi kelewatan dalam penutupan akaun muktamad
description The goal of the preparation of final accounts are approval from the contractor on a fair assessment of the work that he has done and allowing the contract administrator to issue a final certificate, hence closing the project. However, delay in closing of the final account nowadays often becoming an issue as the delay is far away from a reasonable period. Therefore the objectives of this study were to determine the critical steps and to develop an implementation model of the steps to avoid delays in the closing of the final account. The research methodology is obtaining the expert opinions by using the Interpretive Structural Modelling (ISM) approach. Seven experts were referred and their opinions were analysed using the MICMAC abd iteration process analysis. MICMAC analysis showed three critical steps to overcome delay in closing of the final account namely setting a time frame to return the certificate, making assessment, adjustment and measurement and appointing the quantity surveyor according to the appropriate criteria. Whereas, iteration process analysis showed two critical steps as the drivers to overcome delay in closing of the final account namely appointing the quantity surveyor according to the appropriate criteria and maintaining responsible employee. The findings should be benefited by the contract administrator who should focus on the critical steps that are the drivers for other steps in overcoming delay in the closing of the final account.
format Thesis
author Rasid, Ratna
author_facet Rasid, Ratna
author_sort Rasid, Ratna
title Langkah-langkah kritikal untuk mengatasi kelewatan dalam penutupan akaun muktamad
title_short Langkah-langkah kritikal untuk mengatasi kelewatan dalam penutupan akaun muktamad
title_full Langkah-langkah kritikal untuk mengatasi kelewatan dalam penutupan akaun muktamad
title_fullStr Langkah-langkah kritikal untuk mengatasi kelewatan dalam penutupan akaun muktamad
title_full_unstemmed Langkah-langkah kritikal untuk mengatasi kelewatan dalam penutupan akaun muktamad
title_sort langkah-langkah kritikal untuk mengatasi kelewatan dalam penutupan akaun muktamad
publishDate 2017
url http://eprints.utm.my/id/eprint/78967/1/RatnaRasidMFGHT2017.pdf
http://eprints.utm.my/id/eprint/78967/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:106453
_version_ 1643658059453562880
score 13.18916