Rights of contractors on recovery of payment after termination of contract under CIPAA 2012
The Malaysia construction industry has suffered from the reputation as being less efficient and prone to conflict, mainly due to the relationship between main contractors and subcontractors. It has been so-called that main contractors have abused their dominant position in the contractual relationsh...
Saved in:
Main Author: | Ismail, Mohamad Zahierruden |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/78752/1/MohamadZahierrudenIsmailMFAB2017.pdf http://eprints.utm.my/id/eprint/78752/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:106627 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Sub-contractors' remedies upon breach of the main contract
by: Ejau, Ruth Lua
Published: (2017) -
Factors affecting building infrmation modelling adoption by Malaysian consultans and contractors
by: Imoudu, Enegbuma Wallace
Published: (2016) -
No longer majestic after quake
by: UNSPECIFIED,
Published: (2015) -
Interpretation dilemma: payment response in CIPAA 2012
by: Mohd. Bashah, Imee Nurshafinaz
Published: (2016) -
Acylated Amino acids for enhanced oil recovery: Interfacial properties, wettability
alteration, and recovery potential
by: Jannet Yong, Siaw Tze
Published: (2021)