Faktor-faktor kelewatan pembinaan projek perumahan rakyat di negeri Perak

Federal Government is currently allocating a huge budget in developing the affordable house (PPR) project under the RMK-11. However, the performance of development project in the past of RMK-10, should be relooked as it was delayed due to many reasons. Consequently, customer (owner of the project) w...

Full description

Saved in:
Bibliographic Details
Main Author: Sulaiman, Siti Junaida
Format: Thesis
Language:English
Published: 2016
Subjects:
Online Access:http://eprints.utm.my/id/eprint/78557/1/SitiJunaidaSulaimanMFGHT2016.pdf
http://eprints.utm.my/id/eprint/78557/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:94717
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.78557
record_format eprints
spelling my.utm.785572018-08-29T07:51:14Z http://eprints.utm.my/id/eprint/78557/ Faktor-faktor kelewatan pembinaan projek perumahan rakyat di negeri Perak Sulaiman, Siti Junaida G70.212-70.215 Geographic information system Federal Government is currently allocating a huge budget in developing the affordable house (PPR) project under the RMK-11. However, the performance of development project in the past of RMK-10, should be relooked as it was delayed due to many reasons. Consequently, customer (owner of the project) would be affected. The aforesaid incompletion housing project may badly affect the owner of the project and will incur more cost. The Perak State Government is facing the difficulties of three (3) PPR projects, recently. Those delays project lead to the AG’s Dashboard incompliance. Thus, a study need to be done to identity the causes that may hindrance several projects, such as PPR Jalan Laksamana, Hilir Perak and overcome it effectively. This study will involve a collection of data, amongst others, content analysis, site-visit project surveillance and interview of those parties directly responsible, for instance, BPA, SUK, JKR and contractor. Qualitative method is appropriate to analyze the above mentioned data. The findings, apparently, discover several key-delay factors: project owner, project implementer and contractor. Four (4) major factors contribute to the delays: the temple and squatter relocation, the late approval of tower-crane, development order approval and the failure of contractor in evaluating the pilling works. In summary, the study will adequately furnish a necessary information and guidance in making the PPR project a success for the betterment of Perak State Government. 2016-06 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/78557/1/SitiJunaidaSulaimanMFGHT2016.pdf Sulaiman, Siti Junaida (2016) Faktor-faktor kelewatan pembinaan projek perumahan rakyat di negeri Perak. Masters thesis, Universiti Teknologi Malaysia, Faculty of Geoinformation and Real Estate. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:94717
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic G70.212-70.215 Geographic information system
spellingShingle G70.212-70.215 Geographic information system
Sulaiman, Siti Junaida
Faktor-faktor kelewatan pembinaan projek perumahan rakyat di negeri Perak
description Federal Government is currently allocating a huge budget in developing the affordable house (PPR) project under the RMK-11. However, the performance of development project in the past of RMK-10, should be relooked as it was delayed due to many reasons. Consequently, customer (owner of the project) would be affected. The aforesaid incompletion housing project may badly affect the owner of the project and will incur more cost. The Perak State Government is facing the difficulties of three (3) PPR projects, recently. Those delays project lead to the AG’s Dashboard incompliance. Thus, a study need to be done to identity the causes that may hindrance several projects, such as PPR Jalan Laksamana, Hilir Perak and overcome it effectively. This study will involve a collection of data, amongst others, content analysis, site-visit project surveillance and interview of those parties directly responsible, for instance, BPA, SUK, JKR and contractor. Qualitative method is appropriate to analyze the above mentioned data. The findings, apparently, discover several key-delay factors: project owner, project implementer and contractor. Four (4) major factors contribute to the delays: the temple and squatter relocation, the late approval of tower-crane, development order approval and the failure of contractor in evaluating the pilling works. In summary, the study will adequately furnish a necessary information and guidance in making the PPR project a success for the betterment of Perak State Government.
format Thesis
author Sulaiman, Siti Junaida
author_facet Sulaiman, Siti Junaida
author_sort Sulaiman, Siti Junaida
title Faktor-faktor kelewatan pembinaan projek perumahan rakyat di negeri Perak
title_short Faktor-faktor kelewatan pembinaan projek perumahan rakyat di negeri Perak
title_full Faktor-faktor kelewatan pembinaan projek perumahan rakyat di negeri Perak
title_fullStr Faktor-faktor kelewatan pembinaan projek perumahan rakyat di negeri Perak
title_full_unstemmed Faktor-faktor kelewatan pembinaan projek perumahan rakyat di negeri Perak
title_sort faktor-faktor kelewatan pembinaan projek perumahan rakyat di negeri perak
publishDate 2016
url http://eprints.utm.my/id/eprint/78557/1/SitiJunaidaSulaimanMFGHT2016.pdf
http://eprints.utm.my/id/eprint/78557/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:94717
_version_ 1643657935196258304
score 13.18916