Time risk assessment framework for highway projects in Nigeria

Time overrun on construction projects continue to linger and is substantial in both developed and developing countries. Numerous risk management standards and risk assessment models have been developed to identify and minimise risks in improving time performance of construction projects. However, su...

Full description

Saved in:
Bibliographic Details
Main Author: Salawu, Rasheed Adewale
Format: Thesis
Language:English
Published: 2016
Subjects:
Online Access:http://eprints.utm.my/id/eprint/78488/1/RasheedAdewaleSalawuPFAB2016.pdf
http://eprints.utm.my/id/eprint/78488/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:97416
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.78488
record_format eprints
spelling my.utm.784882018-08-26T04:56:32Z http://eprints.utm.my/id/eprint/78488/ Time risk assessment framework for highway projects in Nigeria Salawu, Rasheed Adewale QE Geology Time overrun on construction projects continue to linger and is substantial in both developed and developing countries. Numerous risk management standards and risk assessment models have been developed to identify and minimise risks in improving time performance of construction projects. However, such attempts do not seem parallel with the improvements required. Hence, this study aims to develop a two dimensional risk assessment framework for highway rehabilitation projects by integrating probability and severity measures of significant risk factors with organisational risk management capability measures to derive risk magnitude index for highway rehabilitation projects. To accomplish this aim, quantitative survey research design was employed. Two sets of questionnaires were developed and administered to construction professionals and organisations that are directly involved in the execution of the sampled design, bid and build highway rehabilitation projects in Nigeria. List and classification of risk factors were validated by Delphi survey and data collected from the questionnaire survey were analysed by the application of Fuzzy set theory, analysis of variance and spearman rank correlation. Results of the data analysis reveal that the overall risk indices on rehabilitation projects executed by different construction organisations are significantly different but have strong inverse relationship with the risk management maturity indices of the construction organisations. Based on this relationship, a decision matrix was developed as a tool to combine overall risk indices with risk management maturity indices to derive risk magnitude indices for all risk factors and project level risk. The inputs, concepts, techniques and tools leading to this result formed the basis for the development of the proposed risk assessment framework. The framework was validated through structured interview with a team of experts. The validation team strongly agreed with the logical soundness and completeness of the proposed two dimensional risk assessment framework, affirming the framework to be practicable and acceptable for assessing time risks on highway rehabilitation projects in Nigeria. The framework can thus be adopted to ensure a complete and comprehensive assessment of risk on highway rehabilitation projects. 2016-03 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/78488/1/RasheedAdewaleSalawuPFAB2016.pdf Salawu, Rasheed Adewale (2016) Time risk assessment framework for highway projects in Nigeria. PhD thesis, Universiti Teknologi Malaysia, Faculty of Built Environment. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:97416
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic QE Geology
spellingShingle QE Geology
Salawu, Rasheed Adewale
Time risk assessment framework for highway projects in Nigeria
description Time overrun on construction projects continue to linger and is substantial in both developed and developing countries. Numerous risk management standards and risk assessment models have been developed to identify and minimise risks in improving time performance of construction projects. However, such attempts do not seem parallel with the improvements required. Hence, this study aims to develop a two dimensional risk assessment framework for highway rehabilitation projects by integrating probability and severity measures of significant risk factors with organisational risk management capability measures to derive risk magnitude index for highway rehabilitation projects. To accomplish this aim, quantitative survey research design was employed. Two sets of questionnaires were developed and administered to construction professionals and organisations that are directly involved in the execution of the sampled design, bid and build highway rehabilitation projects in Nigeria. List and classification of risk factors were validated by Delphi survey and data collected from the questionnaire survey were analysed by the application of Fuzzy set theory, analysis of variance and spearman rank correlation. Results of the data analysis reveal that the overall risk indices on rehabilitation projects executed by different construction organisations are significantly different but have strong inverse relationship with the risk management maturity indices of the construction organisations. Based on this relationship, a decision matrix was developed as a tool to combine overall risk indices with risk management maturity indices to derive risk magnitude indices for all risk factors and project level risk. The inputs, concepts, techniques and tools leading to this result formed the basis for the development of the proposed risk assessment framework. The framework was validated through structured interview with a team of experts. The validation team strongly agreed with the logical soundness and completeness of the proposed two dimensional risk assessment framework, affirming the framework to be practicable and acceptable for assessing time risks on highway rehabilitation projects in Nigeria. The framework can thus be adopted to ensure a complete and comprehensive assessment of risk on highway rehabilitation projects.
format Thesis
author Salawu, Rasheed Adewale
author_facet Salawu, Rasheed Adewale
author_sort Salawu, Rasheed Adewale
title Time risk assessment framework for highway projects in Nigeria
title_short Time risk assessment framework for highway projects in Nigeria
title_full Time risk assessment framework for highway projects in Nigeria
title_fullStr Time risk assessment framework for highway projects in Nigeria
title_full_unstemmed Time risk assessment framework for highway projects in Nigeria
title_sort time risk assessment framework for highway projects in nigeria
publishDate 2016
url http://eprints.utm.my/id/eprint/78488/1/RasheedAdewaleSalawuPFAB2016.pdf
http://eprints.utm.my/id/eprint/78488/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:97416
_version_ 1643657913134219264
score 13.18916