Limitation period in latent defects
Under traditional contract, a contractor is responsible for the quality of material and workmanship either being expressed in the contract document or by implication. Contractors often believe that the latent defects is no longer their responsibility after the job is handed over to the employer or s...
Saved in:
Main Author: | Lin, Mazuan |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/77710/1/MazuanLinMFAB2016.pdf http://eprints.utm.my/id/eprint/77710/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:94025 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The Impact Of Latent Defects On The Public
Buildings In Malaysia
by: Talib, Roslan
Published: (2022) -
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
by: Lim, Tze Shwan
Published: (2011) -
Comparative study of defect liability period practices between Malaysia and Nigeria
by: Oluwole, Alejo Ayodele
Published: (2012) -
Building inspection for defect liability period at Setia ECO Glades Cyberjaya / Nurul Najah Nasrul
by: Nasrul, Nurul Najah
Published: (2022)