Enhanced time of use electricity pricing for commercial customers in Malaysia
Malaysia has introduced a new Time of Use (ToU) tariff scheme known as Enhanced ToU (EToU) for commercial and industrial customers. EToU is a more detailed pricing scheme where one day time frame is divided into six period blocks as compared to only two period blocks in the existing ToU. Mid-peak ta...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Published: |
Universiti Putra Malaysia Press
2017
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/77020/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-85029642409&partnerID=40&md5=116977ac41575e1af8949fc2fb41b882 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.77020 |
---|---|
record_format |
eprints |
spelling |
my.utm.770202018-05-31T09:34:44Z http://eprints.utm.my/id/eprint/77020/ Enhanced time of use electricity pricing for commercial customers in Malaysia Azman, N. A. M. Abdullah, M. P. Hassan, M. Y. Said, D. M. Hussin, F. TK Electrical engineering. Electronics Nuclear engineering Malaysia has introduced a new Time of Use (ToU) tariff scheme known as Enhanced ToU (EToU) for commercial and industrial customers. EToU is a more detailed pricing scheme where one day time frame is divided into six period blocks as compared to only two period blocks in the existing ToU. Mid-peak tariff is introduced to the existing peak and off-peak tariff. Off-peak rate for EToU is significantly lower than the existing off-peak rate but the peak rate is much higher. EToU is designed to motivate users to reduce their consumption during peak hours or shift the load to mid-peak or off-peak hours, which if done correctly can reduce the electricity bill while maintaining electricity consumption. This new EToU scheme will benefit consumers if they are able to shift consumption from peak-hours into mid-peak or off-peak hours. This paper assesses the amount of load shifting that is required based on customers’ load profile and EToU rates. The load profile data of an office building in Putrajaya, Malaysia is used as a case study. Universiti Putra Malaysia Press 2017 Article PeerReviewed Azman, N. A. M. and Abdullah, M. P. and Hassan, M. Y. and Said, D. M. and Hussin, F. (2017) Enhanced time of use electricity pricing for commercial customers in Malaysia. Pertanika Journal of Science and Technology, 25 (S). pp. 285-294. ISSN 0128-7680 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85029642409&partnerID=40&md5=116977ac41575e1af8949fc2fb41b882 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
topic |
TK Electrical engineering. Electronics Nuclear engineering |
spellingShingle |
TK Electrical engineering. Electronics Nuclear engineering Azman, N. A. M. Abdullah, M. P. Hassan, M. Y. Said, D. M. Hussin, F. Enhanced time of use electricity pricing for commercial customers in Malaysia |
description |
Malaysia has introduced a new Time of Use (ToU) tariff scheme known as Enhanced ToU (EToU) for commercial and industrial customers. EToU is a more detailed pricing scheme where one day time frame is divided into six period blocks as compared to only two period blocks in the existing ToU. Mid-peak tariff is introduced to the existing peak and off-peak tariff. Off-peak rate for EToU is significantly lower than the existing off-peak rate but the peak rate is much higher. EToU is designed to motivate users to reduce their consumption during peak hours or shift the load to mid-peak or off-peak hours, which if done correctly can reduce the electricity bill while maintaining electricity consumption. This new EToU scheme will benefit consumers if they are able to shift consumption from peak-hours into mid-peak or off-peak hours. This paper assesses the amount of load shifting that is required based on customers’ load profile and EToU rates. The load profile data of an office building in Putrajaya, Malaysia is used as a case study. |
format |
Article |
author |
Azman, N. A. M. Abdullah, M. P. Hassan, M. Y. Said, D. M. Hussin, F. |
author_facet |
Azman, N. A. M. Abdullah, M. P. Hassan, M. Y. Said, D. M. Hussin, F. |
author_sort |
Azman, N. A. M. |
title |
Enhanced time of use electricity pricing for commercial customers in Malaysia |
title_short |
Enhanced time of use electricity pricing for commercial customers in Malaysia |
title_full |
Enhanced time of use electricity pricing for commercial customers in Malaysia |
title_fullStr |
Enhanced time of use electricity pricing for commercial customers in Malaysia |
title_full_unstemmed |
Enhanced time of use electricity pricing for commercial customers in Malaysia |
title_sort |
enhanced time of use electricity pricing for commercial customers in malaysia |
publisher |
Universiti Putra Malaysia Press |
publishDate |
2017 |
url |
http://eprints.utm.my/id/eprint/77020/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-85029642409&partnerID=40&md5=116977ac41575e1af8949fc2fb41b882 |
_version_ |
1643657475069575168 |
score |
13.209306 |