Enhanced time of use electricity pricing for industrial customers in Malaysia

New Time of Use (ToU) tariff scheme known as Enhanced ToU (EToU) has been introduced on 1st January 2016 for industrial customers in Malaysia. EToU scheme is the advanced version of current ToU where the daily time frame is divided into six period blocks, as compared to only two in the existing ToU....

Full description

Saved in:
Bibliographic Details
Main Authors: Azman, N. A. M., Abdullah, M. P., Hassan, M. Y., Said, D. M., Hussin, F.
Format: Article
Published: Institute of Advanced Engineering and Science 2017
Subjects:
Online Access:http://eprints.utm.my/id/eprint/76280/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85019628619&doi=10.11591%2fijeecs.v6.i1.pp155-160&partnerID=40&md5=25dcb778726951f97b864ae58b96344a
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:New Time of Use (ToU) tariff scheme known as Enhanced ToU (EToU) has been introduced on 1st January 2016 for industrial customers in Malaysia. EToU scheme is the advanced version of current ToU where the daily time frame is divided into six period blocks, as compared to only two in the existing ToU. Mid-peak tariff is introduced on top of peak-hour and off-peak tariff. The new scheme is designed to reduce Malaysia’s peak hour electricity demand. On customer side, they could be benefited from the low off-peak tariff by simply shifting their consu mption. However, it depends on their consumption profile and their flexibility in shifting their consumption. Since EToU scheme is voluntary, each customer needs to perform cost-benefit analysis before deciding to switch into the scheme. This paper analyzes this problem by considering EToU tariff scheme for industry and customer’s electricity consumption profile. Case studies using different practical data from different industries are presented and discussed in this paper.