Centralised sewage treatment plant assisted by geographic information system for electricity generation

Municipal wastewater or sewage management is crucial as it is one of the major contributors for greenhouse gas (GHG). The biogas yield from biological treatment in sewage treatment plant (STP) contains about 60 % methane. Existing plant in Malaysia are lacking in capturing this by-product. There is...

Full description

Saved in:
Bibliographic Details
Main Authors: Tarmizi, M. S., Muis, Z. A., Hashim, H., Lim, J. S., Ho, W. S.
Format: Article
Published: Italian Association of Chemical Engineering - AIDIC 2017
Subjects:
Online Access:http://eprints.utm.my/id/eprint/75577/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85019450425&doi=10.3303%2fCET1756195&partnerID=40&md5=021f76912d92e02824cb9f38d3631386
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.75577
record_format eprints
spelling my.utm.755772018-04-15T08:05:27Z http://eprints.utm.my/id/eprint/75577/ Centralised sewage treatment plant assisted by geographic information system for electricity generation Tarmizi, M. S. Muis, Z. A. Hashim, H. Lim, J. S. Ho, W. S. TP Chemical technology Municipal wastewater or sewage management is crucial as it is one of the major contributors for greenhouse gas (GHG). The biogas yield from biological treatment in sewage treatment plant (STP) contains about 60 % methane. Existing plant in Malaysia are lacking in capturing this by-product. There is a great potential for capturing biogas and combust it to harness energy. Centralised sewage treatment plant (CSTP) is suggested as long term solution for the increasing number of population and environment concern. Optimum location is an important criterion in building new CSTP in order to keep up with rapid development. The main objective of this study is to develop multi-period planning of centralised sewage treatment plant (CSTP) for electricity generation in Iskandar Malaysia. It can be divided into 5 stages; data gathering, problem formulation and superstructure construction, mathematical modelling, General Algebraic Modeling System (GAMS) coding and result analysis. In this study, GIS is used as preliminary step to generate and prepare data for mathematical model. It should plot the sources, substation and new location of CSTP. The software provides the distance between sources of sewage and new plant plus. The plant is able to produce 8 GWh/y of electricity. The model is capable of proposing location of new centralised sewage treatment plant, technology selection and its capacity. Italian Association of Chemical Engineering - AIDIC 2017 Article PeerReviewed Tarmizi, M. S. and Muis, Z. A. and Hashim, H. and Lim, J. S. and Ho, W. S. (2017) Centralised sewage treatment plant assisted by geographic information system for electricity generation. Chemical Engineering Transactions, 56 . pp. 1165-1170. ISSN 2283-9216 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85019450425&doi=10.3303%2fCET1756195&partnerID=40&md5=021f76912d92e02824cb9f38d3631386
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TP Chemical technology
spellingShingle TP Chemical technology
Tarmizi, M. S.
Muis, Z. A.
Hashim, H.
Lim, J. S.
Ho, W. S.
Centralised sewage treatment plant assisted by geographic information system for electricity generation
description Municipal wastewater or sewage management is crucial as it is one of the major contributors for greenhouse gas (GHG). The biogas yield from biological treatment in sewage treatment plant (STP) contains about 60 % methane. Existing plant in Malaysia are lacking in capturing this by-product. There is a great potential for capturing biogas and combust it to harness energy. Centralised sewage treatment plant (CSTP) is suggested as long term solution for the increasing number of population and environment concern. Optimum location is an important criterion in building new CSTP in order to keep up with rapid development. The main objective of this study is to develop multi-period planning of centralised sewage treatment plant (CSTP) for electricity generation in Iskandar Malaysia. It can be divided into 5 stages; data gathering, problem formulation and superstructure construction, mathematical modelling, General Algebraic Modeling System (GAMS) coding and result analysis. In this study, GIS is used as preliminary step to generate and prepare data for mathematical model. It should plot the sources, substation and new location of CSTP. The software provides the distance between sources of sewage and new plant plus. The plant is able to produce 8 GWh/y of electricity. The model is capable of proposing location of new centralised sewage treatment plant, technology selection and its capacity.
format Article
author Tarmizi, M. S.
Muis, Z. A.
Hashim, H.
Lim, J. S.
Ho, W. S.
author_facet Tarmizi, M. S.
Muis, Z. A.
Hashim, H.
Lim, J. S.
Ho, W. S.
author_sort Tarmizi, M. S.
title Centralised sewage treatment plant assisted by geographic information system for electricity generation
title_short Centralised sewage treatment plant assisted by geographic information system for electricity generation
title_full Centralised sewage treatment plant assisted by geographic information system for electricity generation
title_fullStr Centralised sewage treatment plant assisted by geographic information system for electricity generation
title_full_unstemmed Centralised sewage treatment plant assisted by geographic information system for electricity generation
title_sort centralised sewage treatment plant assisted by geographic information system for electricity generation
publisher Italian Association of Chemical Engineering - AIDIC
publishDate 2017
url http://eprints.utm.my/id/eprint/75577/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85019450425&doi=10.3303%2fCET1756195&partnerID=40&md5=021f76912d92e02824cb9f38d3631386
_version_ 1643657100888375296
score 13.214268