Challenges in design and construction of deep excavation for KVMRT in Kuala Lumpur limestone formation
The Klang Valley Mass Rapid Transit (KVMRT) Sungai Buloh-Kajang Line project is the first Mass Rapid Transit (MRT) project in Malaysia. The KVMRT Project when completed will cover a distance of 51km and comprises of 31 passenger stations. This paper covers the challenges in design and construction o...
Saved in:
Main Authors: | Tan, Y. C., Chow, C. M., Koo, K. S., Nazir, R. |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UTM Press
2016
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/74448/1/RamliNazir2016_ChallengesinDesignandConstruction.pdf http://eprints.utm.my/id/eprint/74448/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-84988504435&doi=10.11113%2fjt.v78.9629&partnerID=40&md5=477d5747b93c07a6de0b363c60790d14 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Greenfield settlement of kvmrt ssp line 2 in kuala lumpur limestone formation
by: Azhari, N.A., et al.
Published: (2021) -
Performance of multi-propped deep excavation in Kenny Hill formation
by: Law, Kim Hing
Published: (2008) -
Numerical modeling of diaphragm wall in Kuala Lumpur limestone formation
by: Ng, Huat Hoe
Published: (2007) -
Determination of soil stiffness parameters at a deep excavation construction site in Kenny Hill Formation
by: Law, K.H., et al.
Published: (2014) -
ANALYSIS AND PREDICTION OF GREENFIELD SURFACE SETTLEMENT
IN KENNY HILL FORMATION FOR KVMRT
by: HAZAIRI , HANS
Published: (2018)