Direct-proportional length-based DNA computing implementation for elevator scheduling problem
Implementation and experimental procedures to solve an elevator scheduling problem using direct-proportional length-based DNA computing approach are presented in this paper. All possible travel path combinations of the elevators are encoded by oligonucleotides of length directly proportional to the...
Saved in:
Main Authors: | Muhammad, Mohd. Saufee, Ibrahim, Zuwairie, Ono, Osamu, Khalid, Marzuki |
---|---|
Format: | Conference or Workshop Item |
Published: |
2007
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/7372/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Experimental implementation of direct-proportional length-based DNA computing for elevator scheduling problem
by: Muhammad, Mohd. Saufee, et al.
Published: (2005) -
Experimental implementation of direct-proportional length-based dna computing for numerical optimization of the shortest path problem
by: Ibrahim, Zuwairie, et al.
Published: (2007) -
A study on lower bound of direct proportional length-based DNA computing for shortest path problem
by: Ibrahim, Zuwairie, et al.
Published: (2005) -
Hybrid concentration-controlled direct-proportional length-based DNA computing for numerical optimization of the shortest path problem
by: Ibrahim, Zuwairie, et al.
Published: (2006) -
Experimental comparison of initial pool generation for direct-proportional length-based DNA computing
by: Ibrahim, Zuwairie, et al.
Published: (2007)