Success factors of JIT integration with IBS construction projects- a literature review

The Just-In-Time (JIT) philosophy has been used for many decades to increase productivity through waste elimination process. The purpose of this paper is to contribute to the body of knowledge by addressing the issue of transportation, logistic and material delivery in Industrialized Building System...

Full description

Saved in:
Bibliographic Details
Main Authors: Asri, M. A. N. M., Nawi, M. N. M., Nadarajan, S., Osman, W. N., Harun, A. N.
Format: Article
Published: ExcelingTech Publishers 2016
Subjects:
Online Access:http://eprints.utm.my/id/eprint/71610/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-84983421622&partnerID=40&md5=90470ce8a547587ceb08d27abb978cfc
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.71610
record_format eprints
spelling my.utm.716102017-11-20T08:28:23Z http://eprints.utm.my/id/eprint/71610/ Success factors of JIT integration with IBS construction projects- a literature review Asri, M. A. N. M. Nawi, M. N. M. Nadarajan, S. Osman, W. N. Harun, A. N. T Technology (General) The Just-In-Time (JIT) philosophy has been used for many decades to increase productivity through waste elimination process. The purpose of this paper is to contribute to the body of knowledge by addressing the issue of transportation, logistic and material delivery in Industrialized Building System (IBS) construction projects. This paper through literature review aims to highlight this issue by investigate the key success factors for integrating JIT and IBS in the Malaysian construction industry. Suggestion on how the concept of JIT can contribute for improving the performance of transportation and material delivery activities in IBS projects will be concluded. ExcelingTech Publishers 2016 Article PeerReviewed Asri, M. A. N. M. and Nawi, M. N. M. and Nadarajan, S. and Osman, W. N. and Harun, A. N. (2016) Success factors of JIT integration with IBS construction projects- a literature review. International Journal of Supply Chain Management, 5 (2). pp. 71-76. ISSN 2051-3771 https://www.scopus.com/inward/record.uri?eid=2-s2.0-84983421622&partnerID=40&md5=90470ce8a547587ceb08d27abb978cfc
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic T Technology (General)
spellingShingle T Technology (General)
Asri, M. A. N. M.
Nawi, M. N. M.
Nadarajan, S.
Osman, W. N.
Harun, A. N.
Success factors of JIT integration with IBS construction projects- a literature review
description The Just-In-Time (JIT) philosophy has been used for many decades to increase productivity through waste elimination process. The purpose of this paper is to contribute to the body of knowledge by addressing the issue of transportation, logistic and material delivery in Industrialized Building System (IBS) construction projects. This paper through literature review aims to highlight this issue by investigate the key success factors for integrating JIT and IBS in the Malaysian construction industry. Suggestion on how the concept of JIT can contribute for improving the performance of transportation and material delivery activities in IBS projects will be concluded.
format Article
author Asri, M. A. N. M.
Nawi, M. N. M.
Nadarajan, S.
Osman, W. N.
Harun, A. N.
author_facet Asri, M. A. N. M.
Nawi, M. N. M.
Nadarajan, S.
Osman, W. N.
Harun, A. N.
author_sort Asri, M. A. N. M.
title Success factors of JIT integration with IBS construction projects- a literature review
title_short Success factors of JIT integration with IBS construction projects- a literature review
title_full Success factors of JIT integration with IBS construction projects- a literature review
title_fullStr Success factors of JIT integration with IBS construction projects- a literature review
title_full_unstemmed Success factors of JIT integration with IBS construction projects- a literature review
title_sort success factors of jit integration with ibs construction projects- a literature review
publisher ExcelingTech Publishers
publishDate 2016
url http://eprints.utm.my/id/eprint/71610/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-84983421622&partnerID=40&md5=90470ce8a547587ceb08d27abb978cfc
_version_ 1643656230757990400
score 13.18916