Cost forecasting model for building projects
Ketepatan meramal kos merupakan salah satu elemen terpenting terutamanya pada peringkat pra kontrak. Ramalan kos merupakan suatu yang kompleks kerana pelbagai faktor mempengaruhinya. Ketidak mampuan memahami corak perhubungan tersebut akan mengundang kesan negatif kepada belanjawan pihak klien, prof...
Saved in:
Main Author: | Khalid, Abd. Ghani |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Faculty of Built Environment
2008
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/6707/1/78159.pdf http://eprints.utm.my/id/eprint/6707/ http://www.penerbit.utm.my |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Project cost performance forecasting system
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006) -
IMPLEMENTING BUILDING INFORMATION MODELLING (BIM) FOR CONTROLLING COST OVERRUN IN CONSTRUCTION PROJECTS
by: Kai Chen, Goh, et al.
Published: (2022) -
Unit cost modelling of public building project in Kepulauan Riau- Indonesia / Indrastuti
by: Indrastuti, -
Published: (2014) -
Field Development Cost Forecast in Malaysia
by: Khalil, Nor Amirul Ashraf
Published: (2011) -
Challenges in delivering green building projects: unearthing the transaction costs (TCs)
by: Qian, Queena K., et al.
Published: (2015)