Construction of roller compacted concerete dam: a case study at Batu Hampar dam

Rapid and economical construction are among numerous advantages of the construction of roller compacted concrete (RCC) dam compared to conventional dam. However, the complex process of RCC dam construction is facing difficulties due to lack of understanding and involvement from the local constructio...

Full description

Saved in:
Bibliographic Details
Main Authors: Abdul Hamid, Abdul Rahim, Zulkifli, Assrul Reedza, Arshad, Mohd. Fadzil, Ahmad, Juhaizad
Format: Conference or Workshop Item
Published: 2015
Subjects:
Online Access:http://eprints.utm.my/id/eprint/60749/
https://www.researchgate.net/publication/282785580_Construction_of_Roller_Compacted_Concrete_Dam_A_Case_Study_at_Batu_Hampar_Dam
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.60749
record_format eprints
spelling my.utm.607492017-07-30T08:13:18Z http://eprints.utm.my/id/eprint/60749/ Construction of roller compacted concerete dam: a case study at Batu Hampar dam Abdul Hamid, Abdul Rahim Zulkifli, Assrul Reedza Arshad, Mohd. Fadzil Ahmad, Juhaizad TC Hydraulic engineering. Ocean engineering Rapid and economical construction are among numerous advantages of the construction of roller compacted concrete (RCC) dam compared to conventional dam. However, the complex process of RCC dam construction is facing difficulties due to lack of understanding and involvement from the local construction industry player since this type of construction in Malaysia is still new. Therefore, this paper presents the process of RCC dam construction in Malaysia. Site observation and the review on literature of RCC dam construction was conducted to get the real view on the construction process of such project. The expert panel interview was conducted to get the view on RCC dam construction. Panel interview result was analysed and supported with the literature to gather the process of RCC dam construction. From the result analysis, the construction processes which consist of determination of mix design, RCC production and RCC placement is presented. The new technology is adopted for the construction of gravity dam and the technology is known as roller compacted concrete (RCC). Reference [1] stated that RCC has been rapidly developing over the past 40 years and now is commonly used for gravity dam application. Recently, Malaysia started adopting RCC technology to the gravity dam construction. With the fact that the construction of RCC dam is still new in Malaysia, the understanding on such construction is very limited among local construction industry player. The first RCC dam in Malaysia is Kinta dam which is situated in Ipoh and constructed by Japanese contractor (Hazama Corporation). It was completed in 2007. In 2008, the construction of Batu Hampar dam is started which is the second RCC dam project in Malaysia. Dekon Sdn. Bhd, the local contractor who had no previous experience of RCC dams was selected to construct the dam. The government intention to develop local knowledge or expertise of RCC instead of recourse to international contractor is the main reason why Dekon was selected [2]. The understanding and involvement from the local construction player is still at the early stage. Therefore, the construction personnel such as engineer, the supervisor, the technician, until the general workers has very limited knowledge on the RCC dam project that leads to difficulties. Hence, there is a need to capture the knowledge of RCC dam construction. This study will serve as an avenue for further understanding the construction of RCC dam among the local construction industries player. This paper presents the process of the construction of Roller Compacted Concrete Dam in Malaysia with Batu Hampar dam in Rembau, Negeri Sembilan as the case study since Malaysia has just started to adopt the RCC dam technology in the construction of the Dam project. The scope of this study is focused on construction stage of RCC dam project. This study involves interview sessions with the professional and semi-professional construction personnel who were involved in RCC dam project in Malaysia. 2015 Conference or Workshop Item PeerReviewed Abdul Hamid, Abdul Rahim and Zulkifli, Assrul Reedza and Arshad, Mohd. Fadzil and Ahmad, Juhaizad (2015) Construction of roller compacted concerete dam: a case study at Batu Hampar dam. In: The Masterbuilder, 2015. https://www.researchgate.net/publication/282785580_Construction_of_Roller_Compacted_Concrete_Dam_A_Case_Study_at_Batu_Hampar_Dam
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TC Hydraulic engineering. Ocean engineering
spellingShingle TC Hydraulic engineering. Ocean engineering
Abdul Hamid, Abdul Rahim
Zulkifli, Assrul Reedza
Arshad, Mohd. Fadzil
Ahmad, Juhaizad
Construction of roller compacted concerete dam: a case study at Batu Hampar dam
description Rapid and economical construction are among numerous advantages of the construction of roller compacted concrete (RCC) dam compared to conventional dam. However, the complex process of RCC dam construction is facing difficulties due to lack of understanding and involvement from the local construction industry player since this type of construction in Malaysia is still new. Therefore, this paper presents the process of RCC dam construction in Malaysia. Site observation and the review on literature of RCC dam construction was conducted to get the real view on the construction process of such project. The expert panel interview was conducted to get the view on RCC dam construction. Panel interview result was analysed and supported with the literature to gather the process of RCC dam construction. From the result analysis, the construction processes which consist of determination of mix design, RCC production and RCC placement is presented. The new technology is adopted for the construction of gravity dam and the technology is known as roller compacted concrete (RCC). Reference [1] stated that RCC has been rapidly developing over the past 40 years and now is commonly used for gravity dam application. Recently, Malaysia started adopting RCC technology to the gravity dam construction. With the fact that the construction of RCC dam is still new in Malaysia, the understanding on such construction is very limited among local construction industry player. The first RCC dam in Malaysia is Kinta dam which is situated in Ipoh and constructed by Japanese contractor (Hazama Corporation). It was completed in 2007. In 2008, the construction of Batu Hampar dam is started which is the second RCC dam project in Malaysia. Dekon Sdn. Bhd, the local contractor who had no previous experience of RCC dams was selected to construct the dam. The government intention to develop local knowledge or expertise of RCC instead of recourse to international contractor is the main reason why Dekon was selected [2]. The understanding and involvement from the local construction player is still at the early stage. Therefore, the construction personnel such as engineer, the supervisor, the technician, until the general workers has very limited knowledge on the RCC dam project that leads to difficulties. Hence, there is a need to capture the knowledge of RCC dam construction. This study will serve as an avenue for further understanding the construction of RCC dam among the local construction industries player. This paper presents the process of the construction of Roller Compacted Concrete Dam in Malaysia with Batu Hampar dam in Rembau, Negeri Sembilan as the case study since Malaysia has just started to adopt the RCC dam technology in the construction of the Dam project. The scope of this study is focused on construction stage of RCC dam project. This study involves interview sessions with the professional and semi-professional construction personnel who were involved in RCC dam project in Malaysia.
format Conference or Workshop Item
author Abdul Hamid, Abdul Rahim
Zulkifli, Assrul Reedza
Arshad, Mohd. Fadzil
Ahmad, Juhaizad
author_facet Abdul Hamid, Abdul Rahim
Zulkifli, Assrul Reedza
Arshad, Mohd. Fadzil
Ahmad, Juhaizad
author_sort Abdul Hamid, Abdul Rahim
title Construction of roller compacted concerete dam: a case study at Batu Hampar dam
title_short Construction of roller compacted concerete dam: a case study at Batu Hampar dam
title_full Construction of roller compacted concerete dam: a case study at Batu Hampar dam
title_fullStr Construction of roller compacted concerete dam: a case study at Batu Hampar dam
title_full_unstemmed Construction of roller compacted concerete dam: a case study at Batu Hampar dam
title_sort construction of roller compacted concerete dam: a case study at batu hampar dam
publishDate 2015
url http://eprints.utm.my/id/eprint/60749/
https://www.researchgate.net/publication/282785580_Construction_of_Roller_Compacted_Concrete_Dam_A_Case_Study_at_Batu_Hampar_Dam
_version_ 1643654964380172288
score 13.18916