Modelling of uncertainty on late delivery for construction industry in environmental issues: A preliminary review

The construction industry has many underlying causes and factors of uncertainty that impact on project completion schedule and time management. Uncertainties in design, procurement, operation and environmental issues are the major sources in construction project that should be managed. Most of resea...

Full description

Saved in:
Bibliographic Details
Main Authors: Baharum, Z., Ngadiman, S., Mustaffa, N.
Format: Conference or Workshop Item
Published: 2015
Subjects:
Online Access:http://eprints.utm.my/id/eprint/59379/
http://dx.doi.org/10.1109/EUROSIM.2013.115
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.59379
record_format eprints
spelling my.utm.593792021-12-13T02:44:02Z http://eprints.utm.my/id/eprint/59379/ Modelling of uncertainty on late delivery for construction industry in environmental issues: A preliminary review Baharum, Z. Ngadiman, S. Mustaffa, N. QA75 Electronic computers. Computer science The construction industry has many underlying causes and factors of uncertainty that impact on project completion schedule and time management. Uncertainties in design, procurement, operation and environmental issues are the major sources in construction project that should be managed. Most of researchers proposed a modelling and simulation techniques to solve these uncertainties problem nevertheless not for environmental issues. However, the environmental issues were also leading in significant deviations for project schedule as well in time management. The aims of this paper is to develop an initial model of uncertainty modelling to manage the underlying causes and factors that impact in environmental issue (EI) for construction industry (CI). The uncertainty structure is also presented to show the flows of uncertainty process which will be implemented in this case study as well. The simulation modelling and experimental study will base on a real case study and will verify and validate this suggestion. The validated model might be used as guidance to construction planners and managers to plan their project schedule. Further, the decision support system model-based will be developed for enhancement to integrate all uncertainty's sources to become as a powerful system in the direction of managing the uncertainty. 2015 Conference or Workshop Item PeerReviewed Baharum, Z. and Ngadiman, S. and Mustaffa, N. (2015) Modelling of uncertainty on late delivery for construction industry in environmental issues: A preliminary review. In: 8th EUROSIM Congress on Modelling and Simulation, EUROSIM 2013, 10 - 13 September 2013, Cardiff, Wales. http://dx.doi.org/10.1109/EUROSIM.2013.115
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic QA75 Electronic computers. Computer science
spellingShingle QA75 Electronic computers. Computer science
Baharum, Z.
Ngadiman, S.
Mustaffa, N.
Modelling of uncertainty on late delivery for construction industry in environmental issues: A preliminary review
description The construction industry has many underlying causes and factors of uncertainty that impact on project completion schedule and time management. Uncertainties in design, procurement, operation and environmental issues are the major sources in construction project that should be managed. Most of researchers proposed a modelling and simulation techniques to solve these uncertainties problem nevertheless not for environmental issues. However, the environmental issues were also leading in significant deviations for project schedule as well in time management. The aims of this paper is to develop an initial model of uncertainty modelling to manage the underlying causes and factors that impact in environmental issue (EI) for construction industry (CI). The uncertainty structure is also presented to show the flows of uncertainty process which will be implemented in this case study as well. The simulation modelling and experimental study will base on a real case study and will verify and validate this suggestion. The validated model might be used as guidance to construction planners and managers to plan their project schedule. Further, the decision support system model-based will be developed for enhancement to integrate all uncertainty's sources to become as a powerful system in the direction of managing the uncertainty.
format Conference or Workshop Item
author Baharum, Z.
Ngadiman, S.
Mustaffa, N.
author_facet Baharum, Z.
Ngadiman, S.
Mustaffa, N.
author_sort Baharum, Z.
title Modelling of uncertainty on late delivery for construction industry in environmental issues: A preliminary review
title_short Modelling of uncertainty on late delivery for construction industry in environmental issues: A preliminary review
title_full Modelling of uncertainty on late delivery for construction industry in environmental issues: A preliminary review
title_fullStr Modelling of uncertainty on late delivery for construction industry in environmental issues: A preliminary review
title_full_unstemmed Modelling of uncertainty on late delivery for construction industry in environmental issues: A preliminary review
title_sort modelling of uncertainty on late delivery for construction industry in environmental issues: a preliminary review
publishDate 2015
url http://eprints.utm.my/id/eprint/59379/
http://dx.doi.org/10.1109/EUROSIM.2013.115
_version_ 1720436908742410240
score 13.209306