Optimization of electrical energy consumption and level reliability of water supply system
Generally, high operational cost is associated with all water supply system. This is as a result of the high amount of electric energy consumption ascribed to the system due to its components. The water supply system of the Mara-Japan Industrial Institute (MJII), Beranang, Selangor is one of such sy...
Saved in:
Main Authors: | , , , |
---|---|
格式: | Article |
语言: | English |
出版: |
Penerbit UTM Press
2015
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/56196/1/FatimahShamIsmail2015_OptimizationofElectricalEnergyConsumptionandLevel.pdf http://eprints.utm.my/id/eprint/56196/ http://dx.doi.org/10.11113/jt.v72.3883 |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|