Optimization of electrical energy consumption and level reliability of water supply system
Generally, high operational cost is associated with all water supply system. This is as a result of the high amount of electric energy consumption ascribed to the system due to its components. The water supply system of the Mara-Japan Industrial Institute (MJII), Beranang, Selangor is one of such sy...
Saved in:
Main Authors: | Jusoh, Mohd. Ismail, Abiodun, Folorunso Taliha, Ismail, Fatimah Sham, Shafie, Sohailah |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UTM Press
2015
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/56196/1/FatimahShamIsmail2015_OptimizationofElectricalEnergyConsumptionandLevel.pdf http://eprints.utm.my/id/eprint/56196/ http://dx.doi.org/10.11113/jt.v72.3883 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Pump scheduling optimization model for water supply system using AWGA
by: Folorunso, Taliha Abiodun, et al.
Published: (2013) -
Pump scheduling optimization for electrical energy consumption and reliability level of water supply system
by: Jusoh, Mohd. Ismail
Published: (2013) -
Pump scheduling optimization for water supply system using adaptive weighted sum genetic algorithm
by: Abiodun, Folorunso Taliha
Published: (2013) -
Energy and electricity consumption analysis of Malaysian industrial sector
by: Saidur, R., et al.
Published: (2009) -
A perspective of the Malaysian highway energy consumption and future power supply
by: Saqr, Khalid M., et al.
Published: (2011)