Impact of unplanned schedule compression on project cost

The implementation of unplanned schedule compression is common in the construction environment. When necessary, contractors would need to select methods that also minimize the cost impact on the project. Unfortunately, a limited knowledge exists for determining the methods to be employed in mitigati...

Full description

Saved in:
Bibliographic Details
Main Authors: Mansur, Shaiful Amri, Mohamad Zin, Rosli, Sea, E. N.
Format: Conference or Workshop Item
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/id/eprint/541/1/SAMansur2006_Impactofunplannedschedulecompression.pdf
http://eprints.utm.my/id/eprint/541/
http://civil.utm.my/apsec2015/about-apsec/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.541
record_format eprints
spelling my.utm.5412017-06-22T04:18:39Z http://eprints.utm.my/id/eprint/541/ Impact of unplanned schedule compression on project cost Mansur, Shaiful Amri Mohamad Zin, Rosli Sea, E. N. TH Building construction The implementation of unplanned schedule compression is common in the construction environment. When necessary, contractors would need to select methods that also minimize the cost impact on the project. Unfortunately, a limited knowledge exists for determining the methods to be employed in mitigating these potential negative outcomes of higher project costs. This study investigates the frequency of local contractors having experience with unplanned schedule compression, the methods of unplanned schedule compression percentage of usage, and their impact on project costs. The research was based on interviews and questionnaire surveys with building contractors in Penang. An analysis based on numerical scale was conducted on the responses to obtain the average values of impact on project cost. From the analysis, it was concluded that majority of the respondents have experienced unplanned schedule compression. The most frequently used compression methods are working overtime, employing additional workers and using additional work-shift. The least frequently used methods are set-up crew and special material clean-up crew. Detail project planning, doing it right the first time and construction sequencing have the least impact on increasing project cost. Most contractors select their methods based on familiarity instead of carefully considering the impact on project costs. 2006-09 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/541/1/SAMansur2006_Impactofunplannedschedulecompression.pdf Mansur, Shaiful Amri and Mohamad Zin, Rosli and Sea, E. N. (2006) Impact of unplanned schedule compression on project cost. In: 6th Asia-Pacific Structural Engineering and Construction Conference (APSEC 2006), 5-6 September 2006, Kuala Lumpur, Malaysia. http://civil.utm.my/apsec2015/about-apsec/
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Mansur, Shaiful Amri
Mohamad Zin, Rosli
Sea, E. N.
Impact of unplanned schedule compression on project cost
description The implementation of unplanned schedule compression is common in the construction environment. When necessary, contractors would need to select methods that also minimize the cost impact on the project. Unfortunately, a limited knowledge exists for determining the methods to be employed in mitigating these potential negative outcomes of higher project costs. This study investigates the frequency of local contractors having experience with unplanned schedule compression, the methods of unplanned schedule compression percentage of usage, and their impact on project costs. The research was based on interviews and questionnaire surveys with building contractors in Penang. An analysis based on numerical scale was conducted on the responses to obtain the average values of impact on project cost. From the analysis, it was concluded that majority of the respondents have experienced unplanned schedule compression. The most frequently used compression methods are working overtime, employing additional workers and using additional work-shift. The least frequently used methods are set-up crew and special material clean-up crew. Detail project planning, doing it right the first time and construction sequencing have the least impact on increasing project cost. Most contractors select their methods based on familiarity instead of carefully considering the impact on project costs.
format Conference or Workshop Item
author Mansur, Shaiful Amri
Mohamad Zin, Rosli
Sea, E. N.
author_facet Mansur, Shaiful Amri
Mohamad Zin, Rosli
Sea, E. N.
author_sort Mansur, Shaiful Amri
title Impact of unplanned schedule compression on project cost
title_short Impact of unplanned schedule compression on project cost
title_full Impact of unplanned schedule compression on project cost
title_fullStr Impact of unplanned schedule compression on project cost
title_full_unstemmed Impact of unplanned schedule compression on project cost
title_sort impact of unplanned schedule compression on project cost
publishDate 2006
url http://eprints.utm.my/id/eprint/541/1/SAMansur2006_Impactofunplannedschedulecompression.pdf
http://eprints.utm.my/id/eprint/541/
http://civil.utm.my/apsec2015/about-apsec/
_version_ 1643643127433527296
score 13.18916