Construction stage analysis of a post-tensioned segmental crosshead

In the construction of post-tensioned segmental crosshead, the stresses in the crosshead vary in every stage of the construction as the addition of new segment increases the bending moment while post-tensioning of tendon reduces it. Furthermore, the bending moment in the crosshead during constructio...

Full description

Saved in:
Bibliographic Details
Main Author: Liew, Tian Fuh
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://eprints.utm.my/id/eprint/53803/1/LiewTianFuhMFKChE2015.pdf
http://eprints.utm.my/id/eprint/53803/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:86625
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.53803
record_format eprints
spelling my.utm.538032020-09-06T03:44:54Z http://eprints.utm.my/id/eprint/53803/ Construction stage analysis of a post-tensioned segmental crosshead Liew, Tian Fuh TA Engineering (General). Civil engineering (General) In the construction of post-tensioned segmental crosshead, the stresses in the crosshead vary in every stage of the construction as the addition of new segment increases the bending moment while post-tensioning of tendon reduces it. Furthermore, the bending moment in the crosshead during construction is not balanced as new segment are added at one side of the cantilever at a time together with other construction load that operates on the same side of the new segment. In this paper, a study was conducted with finite element method to investigate the response of various parameters and effect of construction sequences on a segmental crosshead erected by balanced cantilever method. For this operation, a segmental crosshead model was generated using a finite element software and it was analyzed with various construction sequence. The rate of changes in stresses in each stages of construction was investigated and it was found that the stresses were over the limit when construction stage analysis was performed. In addition to that, it was also found that the maximum design moment for pier design can only be obtained by a more rigorous construction stage analysis. 2015-06 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/53803/1/LiewTianFuhMFKChE2015.pdf Liew, Tian Fuh (2015) Construction stage analysis of a post-tensioned segmental crosshead. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:86625
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Liew, Tian Fuh
Construction stage analysis of a post-tensioned segmental crosshead
description In the construction of post-tensioned segmental crosshead, the stresses in the crosshead vary in every stage of the construction as the addition of new segment increases the bending moment while post-tensioning of tendon reduces it. Furthermore, the bending moment in the crosshead during construction is not balanced as new segment are added at one side of the cantilever at a time together with other construction load that operates on the same side of the new segment. In this paper, a study was conducted with finite element method to investigate the response of various parameters and effect of construction sequences on a segmental crosshead erected by balanced cantilever method. For this operation, a segmental crosshead model was generated using a finite element software and it was analyzed with various construction sequence. The rate of changes in stresses in each stages of construction was investigated and it was found that the stresses were over the limit when construction stage analysis was performed. In addition to that, it was also found that the maximum design moment for pier design can only be obtained by a more rigorous construction stage analysis.
format Thesis
author Liew, Tian Fuh
author_facet Liew, Tian Fuh
author_sort Liew, Tian Fuh
title Construction stage analysis of a post-tensioned segmental crosshead
title_short Construction stage analysis of a post-tensioned segmental crosshead
title_full Construction stage analysis of a post-tensioned segmental crosshead
title_fullStr Construction stage analysis of a post-tensioned segmental crosshead
title_full_unstemmed Construction stage analysis of a post-tensioned segmental crosshead
title_sort construction stage analysis of a post-tensioned segmental crosshead
publishDate 2015
url http://eprints.utm.my/id/eprint/53803/1/LiewTianFuhMFKChE2015.pdf
http://eprints.utm.my/id/eprint/53803/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:86625
_version_ 1677781098509107200
score 13.160551