The comparison on the milestone and monthly payment of project performance in public works department

Payment is very crucial factor to make sure projects are performing better and to be delivered according to quality, time and within the original cost allocated. In order to minimize complaints from clients and also to increase project performance, Public Work Department (PWD) has introduced one alt...

Full description

Saved in:
Bibliographic Details
Main Author: Ishak, Shukri
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://eprints.utm.my/id/eprint/53532/1/ShukriIshakMFKA2015.pdf
http://eprints.utm.my/id/eprint/53532/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:85673
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.53532
record_format eprints
spelling my.utm.535322020-07-19T07:27:41Z http://eprints.utm.my/id/eprint/53532/ The comparison on the milestone and monthly payment of project performance in public works department Ishak, Shukri TA Engineering (General). Civil engineering (General) Payment is very crucial factor to make sure projects are performing better and to be delivered according to quality, time and within the original cost allocated. In order to minimize complaints from clients and also to increase project performance, Public Work Department (PWD) has introduced one alternative payment concept known as the Earned Value Milestone Payment (EVMP). This research's main objective is to compare the project performance between EVMP and MPP method in PWD projects. The specific objectives of this study are firstly to identify the performance issues related to MPP and EVMP projects, secondly to evaluate the critical performance factors in term of quality, cost and time and to propose the best payment method to be implemented in PWD projects. This study was conducted by using a qualitative and quantitative approach. Data were collected through survey questionnaire, case study, documents pertaining the project performance and also by conducting interviews with the relevant project stakeholders. The study found that 77% of the respondents agreed that EVMP is good method to make sure the projects can be completed in time, quality and cost allocated if been implemented properly with competence project team members. Positively the case studies revealed that EVMP projects scored the excellent remark for quality of site management, administration, planning, facilities given and also excellent quality of infrastructure works. This research is very important as it will change the future way of payment method in PWD projects. With regard to the benefits and advantages ofEVMP method, it is timely and the right move for PWD to make it mandatory in all projects throughout the country in order to enhance the project performance in the future. 2015-01 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/53532/1/ShukriIshakMFKA2015.pdf Ishak, Shukri (2015) The comparison on the milestone and monthly payment of project performance in public works department. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:85673
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Ishak, Shukri
The comparison on the milestone and monthly payment of project performance in public works department
description Payment is very crucial factor to make sure projects are performing better and to be delivered according to quality, time and within the original cost allocated. In order to minimize complaints from clients and also to increase project performance, Public Work Department (PWD) has introduced one alternative payment concept known as the Earned Value Milestone Payment (EVMP). This research's main objective is to compare the project performance between EVMP and MPP method in PWD projects. The specific objectives of this study are firstly to identify the performance issues related to MPP and EVMP projects, secondly to evaluate the critical performance factors in term of quality, cost and time and to propose the best payment method to be implemented in PWD projects. This study was conducted by using a qualitative and quantitative approach. Data were collected through survey questionnaire, case study, documents pertaining the project performance and also by conducting interviews with the relevant project stakeholders. The study found that 77% of the respondents agreed that EVMP is good method to make sure the projects can be completed in time, quality and cost allocated if been implemented properly with competence project team members. Positively the case studies revealed that EVMP projects scored the excellent remark for quality of site management, administration, planning, facilities given and also excellent quality of infrastructure works. This research is very important as it will change the future way of payment method in PWD projects. With regard to the benefits and advantages ofEVMP method, it is timely and the right move for PWD to make it mandatory in all projects throughout the country in order to enhance the project performance in the future.
format Thesis
author Ishak, Shukri
author_facet Ishak, Shukri
author_sort Ishak, Shukri
title The comparison on the milestone and monthly payment of project performance in public works department
title_short The comparison on the milestone and monthly payment of project performance in public works department
title_full The comparison on the milestone and monthly payment of project performance in public works department
title_fullStr The comparison on the milestone and monthly payment of project performance in public works department
title_full_unstemmed The comparison on the milestone and monthly payment of project performance in public works department
title_sort comparison on the milestone and monthly payment of project performance in public works department
publishDate 2015
url http://eprints.utm.my/id/eprint/53532/1/ShukriIshakMFKA2015.pdf
http://eprints.utm.my/id/eprint/53532/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:85673
_version_ 1674066176436600832
score 13.18916