The conceptual model of uncertainty factors in environmental issues on late delivery for construction industry

Every industry keen to maximize their company profit by fulfils the customer’s satisfaction by perform a very good project deliverable. However, very limited researches on uncertainty in environmental issues (EI) probably could turn as a biggest problem for company, especially in late delivery of pr...

Full description

Saved in:
Bibliographic Details
Main Authors: Zirawani, B., Salihin, M. N., Noorfa, H. M.
Format: Conference or Workshop Item
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/id/eprint/51346/
http://dx.doi.org/10.4028/www.scientific.net/AMR.610-613.2889
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.51346
record_format eprints
spelling my.utm.513462017-08-20T04:41:55Z http://eprints.utm.my/id/eprint/51346/ The conceptual model of uncertainty factors in environmental issues on late delivery for construction industry Zirawani, B. Salihin, M. N. Noorfa, H. M. QA75 Electronic computers. Computer science Every industry keen to maximize their company profit by fulfils the customer’s satisfaction by perform a very good project deliverable. However, very limited researches on uncertainty in environmental issues (EI) probably could turn as a biggest problem for company, especially in late delivery of project completion for construction industry (CI). Uncertainty factors could be mapped by many causes and affects which known or unknown, statically to totally ignorance. Previously, most of research on uncertainty have been model their factors of uncertainties but pay no attention to the EI, whereas in the real cases all the factors must controlled and manageable even it is in-deterministic or non-realistic. Therefore, the modelling of uncertainty factors in EI on late delivery for CI is very important to studied, and it will be considered to be used as the guidance for decision makers when they are facing of the problems that related to uncertainties. This paper will purpose the conceptual model on progress to the modelling of uncertainty factors in EI on late delivery for CI. The uncertainty of environmental can split into two categories; acts of God and acts of humans. 2013 Conference or Workshop Item PeerReviewed Zirawani, B. and Salihin, M. N. and Noorfa, H. M. (2013) The conceptual model of uncertainty factors in environmental issues on late delivery for construction industry. In: Advanced Materials Research. http://dx.doi.org/10.4028/www.scientific.net/AMR.610-613.2889
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic QA75 Electronic computers. Computer science
spellingShingle QA75 Electronic computers. Computer science
Zirawani, B.
Salihin, M. N.
Noorfa, H. M.
The conceptual model of uncertainty factors in environmental issues on late delivery for construction industry
description Every industry keen to maximize their company profit by fulfils the customer’s satisfaction by perform a very good project deliverable. However, very limited researches on uncertainty in environmental issues (EI) probably could turn as a biggest problem for company, especially in late delivery of project completion for construction industry (CI). Uncertainty factors could be mapped by many causes and affects which known or unknown, statically to totally ignorance. Previously, most of research on uncertainty have been model their factors of uncertainties but pay no attention to the EI, whereas in the real cases all the factors must controlled and manageable even it is in-deterministic or non-realistic. Therefore, the modelling of uncertainty factors in EI on late delivery for CI is very important to studied, and it will be considered to be used as the guidance for decision makers when they are facing of the problems that related to uncertainties. This paper will purpose the conceptual model on progress to the modelling of uncertainty factors in EI on late delivery for CI. The uncertainty of environmental can split into two categories; acts of God and acts of humans.
format Conference or Workshop Item
author Zirawani, B.
Salihin, M. N.
Noorfa, H. M.
author_facet Zirawani, B.
Salihin, M. N.
Noorfa, H. M.
author_sort Zirawani, B.
title The conceptual model of uncertainty factors in environmental issues on late delivery for construction industry
title_short The conceptual model of uncertainty factors in environmental issues on late delivery for construction industry
title_full The conceptual model of uncertainty factors in environmental issues on late delivery for construction industry
title_fullStr The conceptual model of uncertainty factors in environmental issues on late delivery for construction industry
title_full_unstemmed The conceptual model of uncertainty factors in environmental issues on late delivery for construction industry
title_sort conceptual model of uncertainty factors in environmental issues on late delivery for construction industry
publishDate 2013
url http://eprints.utm.my/id/eprint/51346/
http://dx.doi.org/10.4028/www.scientific.net/AMR.610-613.2889
_version_ 1643653012539834368
score 13.209306