Combination of TOPSIS and AHP in load shedding scheme for large pulp mill electrical system
In the era of technology, a variety of powerful equipments are design to satisfy the demand of industry sector. However, these equipments need a stable and reliable electrical supply in order for the whole system to flow smoothly. The overview of this paper is mainly about the load shedding applicat...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Published: |
Elsevier Ltd.
2013
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/49798/ http://dx.doi.org/10.1016/j.ijepes.2012.10.059 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.49798 |
---|---|
record_format |
eprints |
spelling |
my.utm.497982019-01-28T04:30:30Z http://eprints.utm.my/id/eprint/49798/ Combination of TOPSIS and AHP in load shedding scheme for large pulp mill electrical system Goh, Hui Hwang Kok, Boon Ching Yeo, H. T. Lee, S. W. Mohd. Zin, Abdullah Asuhaimi TK Electrical engineering. Electronics Nuclear engineering In the era of technology, a variety of powerful equipments are design to satisfy the demand of industry sector. However, these equipments need a stable and reliable electrical supply in order for the whole system to flow smoothly. The overview of this paper is mainly about the load shedding application toward a large pulp mill electrical system using the multi-decision making methods which are the Analytical Hierarchy Process (AHP) and the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) methods. Whenever there are shortages of electrical supply, the load shedding method shall be applied in order to recover and stabilize the system. Load shedding is a module that shed the higher possible load in the system to overcome the voltage shortage in the system. The objective of this paper is to extract the possible unnecessary load and determine the ranking of the load according to their importance level. The proposed methods are to test on the plant load shedding table from a paper pulp mill industry with 25 load points for practical applications. Elsevier Ltd. 2013 Article PeerReviewed Goh, Hui Hwang and Kok, Boon Ching and Yeo, H. T. and Lee, S. W. and Mohd. Zin, Abdullah Asuhaimi (2013) Combination of TOPSIS and AHP in load shedding scheme for large pulp mill electrical system. International Journal of Electrical Power and Energy Systems, 47 (1). pp. 198-204. ISSN 0142-0615 http://dx.doi.org/10.1016/j.ijepes.2012.10.059 DOI: 10.1016/j.ijepes.2012.10.059 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
topic |
TK Electrical engineering. Electronics Nuclear engineering |
spellingShingle |
TK Electrical engineering. Electronics Nuclear engineering Goh, Hui Hwang Kok, Boon Ching Yeo, H. T. Lee, S. W. Mohd. Zin, Abdullah Asuhaimi Combination of TOPSIS and AHP in load shedding scheme for large pulp mill electrical system |
description |
In the era of technology, a variety of powerful equipments are design to satisfy the demand of industry sector. However, these equipments need a stable and reliable electrical supply in order for the whole system to flow smoothly. The overview of this paper is mainly about the load shedding application toward a large pulp mill electrical system using the multi-decision making methods which are the Analytical Hierarchy Process (AHP) and the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) methods. Whenever there are shortages of electrical supply, the load shedding method shall be applied in order to recover and stabilize the system. Load shedding is a module that shed the higher possible load in the system to overcome the voltage shortage in the system. The objective of this paper is to extract the possible unnecessary load and determine the ranking of the load according to their importance level. The proposed methods are to test on the plant load shedding table from a paper pulp mill industry with 25 load points for practical applications. |
format |
Article |
author |
Goh, Hui Hwang Kok, Boon Ching Yeo, H. T. Lee, S. W. Mohd. Zin, Abdullah Asuhaimi |
author_facet |
Goh, Hui Hwang Kok, Boon Ching Yeo, H. T. Lee, S. W. Mohd. Zin, Abdullah Asuhaimi |
author_sort |
Goh, Hui Hwang |
title |
Combination of TOPSIS and AHP in load shedding scheme for large pulp mill electrical system |
title_short |
Combination of TOPSIS and AHP in load shedding scheme for large pulp mill electrical system |
title_full |
Combination of TOPSIS and AHP in load shedding scheme for large pulp mill electrical system |
title_fullStr |
Combination of TOPSIS and AHP in load shedding scheme for large pulp mill electrical system |
title_full_unstemmed |
Combination of TOPSIS and AHP in load shedding scheme for large pulp mill electrical system |
title_sort |
combination of topsis and ahp in load shedding scheme for large pulp mill electrical system |
publisher |
Elsevier Ltd. |
publishDate |
2013 |
url |
http://eprints.utm.my/id/eprint/49798/ http://dx.doi.org/10.1016/j.ijepes.2012.10.059 |
_version_ |
1643652752281174016 |
score |
13.214268 |