Risks in the PAM 2006 standard form of contracts

Construction industry is among one of the dynamic, challenging, satisfying and also risky industries. It involves around many uncertainties and probabilities which is indirectly exposed to risk. Generally risk is known as an uncertain event or condition in which its occurrence could affect the proje...

Full description

Saved in:
Bibliographic Details
Main Author: Arjinan, Sangeetha
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/id/eprint/48852/25/SangeethaArjinanMFAB2014.pdf
http://eprints.utm.my/id/eprint/48852/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:83719
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.48852
record_format eprints
spelling my.utm.488522020-07-01T06:48:57Z http://eprints.utm.my/id/eprint/48852/ Risks in the PAM 2006 standard form of contracts Arjinan, Sangeetha TH Building construction Construction industry is among one of the dynamic, challenging, satisfying and also risky industries. It involves around many uncertainties and probabilities which is indirectly exposed to risk. Generally risk is known as an uncertain event or condition in which its occurrence could affect the project objective and most likely to leave a negative impact. These risks in construction are said to be present from the earlier stage of project such as feasibility stage till the completion stage. The standard form of contract which is used to bind a legal relationship that is enforceable by law between the contracting parties also has some risk. The objective of this study is to identify the risk found in PAM Contract 2006 and to identify the risks probability of occurrence and level of impact. This study had been carried out by using the stages in risk management process. Firstly the risks in terms and condition of contract are identified using the documentation review technique. Later, those risks were ranked according to the probability of occurrence and the level of impact of each risk by conducting a questionnaire survey. The result indicates that there were 46 risks from 23 different clauses identified in terms and condition of PAM Contract 2006. For the probability ranking, there are 10 risks which are almost certainly to occur followed by 31 risks certainly to occur and 5 risks that are likely to occur. Meanwhile for the impact assessment, 27 risks would be leaving very high impact to the objective followed by 19 high impact risks. Overall it can be concluded that risk do exist in terms and condition and one should really understand those terms before entering into contract to avoid any risky events that could affect the project. 2014-06 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/48852/25/SangeethaArjinanMFAB2014.pdf Arjinan, Sangeetha (2014) Risks in the PAM 2006 standard form of contracts. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:83719
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Arjinan, Sangeetha
Risks in the PAM 2006 standard form of contracts
description Construction industry is among one of the dynamic, challenging, satisfying and also risky industries. It involves around many uncertainties and probabilities which is indirectly exposed to risk. Generally risk is known as an uncertain event or condition in which its occurrence could affect the project objective and most likely to leave a negative impact. These risks in construction are said to be present from the earlier stage of project such as feasibility stage till the completion stage. The standard form of contract which is used to bind a legal relationship that is enforceable by law between the contracting parties also has some risk. The objective of this study is to identify the risk found in PAM Contract 2006 and to identify the risks probability of occurrence and level of impact. This study had been carried out by using the stages in risk management process. Firstly the risks in terms and condition of contract are identified using the documentation review technique. Later, those risks were ranked according to the probability of occurrence and the level of impact of each risk by conducting a questionnaire survey. The result indicates that there were 46 risks from 23 different clauses identified in terms and condition of PAM Contract 2006. For the probability ranking, there are 10 risks which are almost certainly to occur followed by 31 risks certainly to occur and 5 risks that are likely to occur. Meanwhile for the impact assessment, 27 risks would be leaving very high impact to the objective followed by 19 high impact risks. Overall it can be concluded that risk do exist in terms and condition and one should really understand those terms before entering into contract to avoid any risky events that could affect the project.
format Thesis
author Arjinan, Sangeetha
author_facet Arjinan, Sangeetha
author_sort Arjinan, Sangeetha
title Risks in the PAM 2006 standard form of contracts
title_short Risks in the PAM 2006 standard form of contracts
title_full Risks in the PAM 2006 standard form of contracts
title_fullStr Risks in the PAM 2006 standard form of contracts
title_full_unstemmed Risks in the PAM 2006 standard form of contracts
title_sort risks in the pam 2006 standard form of contracts
publishDate 2014
url http://eprints.utm.my/id/eprint/48852/25/SangeethaArjinanMFAB2014.pdf
http://eprints.utm.my/id/eprint/48852/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:83719
_version_ 1672610476744245248
score 13.18916