It has been pointed out by IACM that the frequency of claims had increased by more than 30% in the last 3 years. This is a worrying trend as such there is a need for a project manager and contract administrator to adopt an anticipatory management approach by regularly monitoring and analysing the cl...

Full description

Saved in:
Bibliographic Details
Main Author: Samsudin, Nur Jazlianna
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/id/eprint/48812/25/NurJazliannaSamsudinMFAB2014.pdf
http://eprints.utm.my/id/eprint/48812/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:83660
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.48812
record_format eprints
spelling my.utm.488122020-06-24T02:50:53Z http://eprints.utm.my/id/eprint/48812/ Profile of construction contractual claims Samsudin, Nur Jazlianna TH Building construction It has been pointed out by IACM that the frequency of claims had increased by more than 30% in the last 3 years. This is a worrying trend as such there is a need for a project manager and contract administrator to adopt an anticipatory management approach by regularly monitoring and analysing the claims in their projects. One way of doing this is by identifying the pattern or trend of construction claims that have been reported in a law report. Therefore, this research aimed to develop profile of contractual claim in term of type of head of claim, causes of claim, the parties involved, type of project, the standard form, time of claim occur and the origin of claim resolution. This research is limited to Malaysian law cases between 1999 until 2013. This research is based on secondary data on 70 cases. These cases are analysed to obtain the pattern of different field of profile. This study indicates the claim for payment has the highest percentage of all project. It also points out that the highest cause to the payment claim is due to the claim for work done. It had been highlighted that the highest frequency of parties involved in claim for all type of project is the main contractor. Most of the claims are based on PAM standard form. This research also shows claims are commonly made during construction phase and the origin of claim resolution is going straight to the court. Hopefully, these profiles would be able to highlight the pattern or trend of the claim and can provide some guidelines for managers to anticipate in the future claims problem. 2014-09 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/48812/25/NurJazliannaSamsudinMFAB2014.pdf Samsudin, Nur Jazlianna (2014) Profile of construction contractual claims. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:83660
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Samsudin, Nur Jazlianna
Profile of construction contractual claims
description It has been pointed out by IACM that the frequency of claims had increased by more than 30% in the last 3 years. This is a worrying trend as such there is a need for a project manager and contract administrator to adopt an anticipatory management approach by regularly monitoring and analysing the claims in their projects. One way of doing this is by identifying the pattern or trend of construction claims that have been reported in a law report. Therefore, this research aimed to develop profile of contractual claim in term of type of head of claim, causes of claim, the parties involved, type of project, the standard form, time of claim occur and the origin of claim resolution. This research is limited to Malaysian law cases between 1999 until 2013. This research is based on secondary data on 70 cases. These cases are analysed to obtain the pattern of different field of profile. This study indicates the claim for payment has the highest percentage of all project. It also points out that the highest cause to the payment claim is due to the claim for work done. It had been highlighted that the highest frequency of parties involved in claim for all type of project is the main contractor. Most of the claims are based on PAM standard form. This research also shows claims are commonly made during construction phase and the origin of claim resolution is going straight to the court. Hopefully, these profiles would be able to highlight the pattern or trend of the claim and can provide some guidelines for managers to anticipate in the future claims problem.
format Thesis
author Samsudin, Nur Jazlianna
author_facet Samsudin, Nur Jazlianna
author_sort Samsudin, Nur Jazlianna
title Profile of construction contractual claims
title_short Profile of construction contractual claims
title_full Profile of construction contractual claims
title_fullStr Profile of construction contractual claims
title_full_unstemmed Profile of construction contractual claims
title_sort profile of construction contractual claims
publishDate 2014
url http://eprints.utm.my/id/eprint/48812/25/NurJazliannaSamsudinMFAB2014.pdf
http://eprints.utm.my/id/eprint/48812/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:83660
_version_ 1672610470960300032
score 13.18916