Preliminary Analysis of Precise Levelling Network for The Southern Peninsular Malaysia

Precise levelling has been planned and implemented by the Department of Surveying and Mapping Malaysia (DSMM) for the provisioning of the levelling framework of the country. The precise levelling network provides the vertical reference datum for mapping and engineering purposes as well as for scien...

Full description

Saved in:
Bibliographic Details
Main Authors: Abu, Samad, A. Kadir, Abd. Majid, Ses, Shahrum
Format: Article
Language:English
Published: Fakulti Kejuruteraan & Sains Geoinformasi, Universiti Teknologi Malaysia. 1997
Subjects:
Online Access:http://eprints.utm.my/id/eprint/4855/1/preliminary_analysis.pdf
http://eprints.utm.my/id/eprint/4855/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.4855
record_format eprints
spelling my.utm.48552017-10-16T01:45:17Z http://eprints.utm.my/id/eprint/4855/ Preliminary Analysis of Precise Levelling Network for The Southern Peninsular Malaysia Abu, Samad A. Kadir, Abd. Majid Ses, Shahrum TA Engineering (General). Civil engineering (General) Precise levelling has been planned and implemented by the Department of Surveying and Mapping Malaysia (DSMM) for the provisioning of the levelling framework of the country. The precise levelling network provides the vertical reference datum for mapping and engineering purposes as well as for scientific research work, which includes tectonic movement monitoring and mean sea level studies. At present, twelve loops of precise levelling which cover the southern part of the Peninsular Malaysia were surveyed, processed and adjusted. The precise levelling was made with high precision levelling instruments which are currently used by DSMM, namely, Zeiss NI002A and digital automatic level, Wild NA3000. These instruments are capable of storing data in computer readable form for the purpose of processing and adjustment. Data acquired from the field were processed by RAPC-1 and DELTA processing software. Adjustment and analysis were made using Geolab network adjustment software. For future investigations on Peninsular Malaysia Height Datum, the levelling network has been tied to first order GPS network and tide gauge" stations. This paper briefly described the procedures for the acquisition, processing and adjustment of the levelling data for the twelve levelling loops covering the southern half of Peninsular Malaysia. Fakulti Kejuruteraan & Sains Geoinformasi, Universiti Teknologi Malaysia. 1997-04 Article PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/4855/1/preliminary_analysis.pdf Abu, Samad and A. Kadir, Abd. Majid and Ses, Shahrum (1997) Preliminary Analysis of Precise Levelling Network for The Southern Peninsular Malaysia. Buletin Geoinformasi, 1 (1). ISSN 1394-7702
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Abu, Samad
A. Kadir, Abd. Majid
Ses, Shahrum
Preliminary Analysis of Precise Levelling Network for The Southern Peninsular Malaysia
description Precise levelling has been planned and implemented by the Department of Surveying and Mapping Malaysia (DSMM) for the provisioning of the levelling framework of the country. The precise levelling network provides the vertical reference datum for mapping and engineering purposes as well as for scientific research work, which includes tectonic movement monitoring and mean sea level studies. At present, twelve loops of precise levelling which cover the southern part of the Peninsular Malaysia were surveyed, processed and adjusted. The precise levelling was made with high precision levelling instruments which are currently used by DSMM, namely, Zeiss NI002A and digital automatic level, Wild NA3000. These instruments are capable of storing data in computer readable form for the purpose of processing and adjustment. Data acquired from the field were processed by RAPC-1 and DELTA processing software. Adjustment and analysis were made using Geolab network adjustment software. For future investigations on Peninsular Malaysia Height Datum, the levelling network has been tied to first order GPS network and tide gauge" stations. This paper briefly described the procedures for the acquisition, processing and adjustment of the levelling data for the twelve levelling loops covering the southern half of Peninsular Malaysia.
format Article
author Abu, Samad
A. Kadir, Abd. Majid
Ses, Shahrum
author_facet Abu, Samad
A. Kadir, Abd. Majid
Ses, Shahrum
author_sort Abu, Samad
title Preliminary Analysis of Precise Levelling Network for The Southern Peninsular Malaysia
title_short Preliminary Analysis of Precise Levelling Network for The Southern Peninsular Malaysia
title_full Preliminary Analysis of Precise Levelling Network for The Southern Peninsular Malaysia
title_fullStr Preliminary Analysis of Precise Levelling Network for The Southern Peninsular Malaysia
title_full_unstemmed Preliminary Analysis of Precise Levelling Network for The Southern Peninsular Malaysia
title_sort preliminary analysis of precise levelling network for the southern peninsular malaysia
publisher Fakulti Kejuruteraan & Sains Geoinformasi, Universiti Teknologi Malaysia.
publishDate 1997
url http://eprints.utm.my/id/eprint/4855/1/preliminary_analysis.pdf
http://eprints.utm.my/id/eprint/4855/
_version_ 1643644166657277952
score 13.18916