Migrating on -premises application to windows azure platform (microsoft cloud)

Legacy systems are usually attached with outdated technologies which over time become a bottleneck for organizations to manage and maintain. Old and poorly utilized architecture make systems run slow and far from expected, however sometimes organization cannot live without those. Renewing applicatio...

Full description

Saved in:
Bibliographic Details
Main Author: Pakbaz, Asghar
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/id/eprint/48238/1/AsgharPakbazMFC2013.pdf
http://eprints.utm.my/id/eprint/48238/
http://libraryopac.utm.my/client/en_AU/main/search/results/?lm=&qu=Migrating+on+-premises+application+to+windows+azure+platform+%28microsoft+cloud%29&rt=&submit=
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.48238
record_format eprints
spelling my.utm.482382017-09-19T03:57:04Z http://eprints.utm.my/id/eprint/48238/ Migrating on -premises application to windows azure platform (microsoft cloud) Pakbaz, Asghar QA76 Computer software Legacy systems are usually attached with outdated technologies which over time become a bottleneck for organizations to manage and maintain. Old and poorly utilized architecture make systems run slow and far from expected, however sometimes organization cannot live without those. Renewing application architecture can be considered as an option but it is time consuming and very costly. Cloud computing as an ultimate solution can be proposed to migrate on-premises application to a utilized environment in terms of infrastructure, computing power and virtualization. In addition, it provides a highly available and elastic computing environment which makes organizations to only pay for what they use. In this research, after a brief introduction to main concepts of cloud computing particularly Windows Azure platform (Microsoft Cloud), it is tried to analyze and assess OnePortfolio system developed by Riskk Sdn Bhd, to see whether it is feasible to be moved to Windows Azure. OnePortfolio operates on a SOA architecture comprised of three main components: services, client application and database. Throughout this research, Windows Azure migration lifecycle in compliance with ISO/IEC 14764 international standard is used as the methodology to perform the migration. Once the application is analyzed and migrated to cloud, it is compared to on-premises environment to evaluate its performance and security mechanism. 2013 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/48238/1/AsgharPakbazMFC2013.pdf Pakbaz, Asghar (2013) Migrating on -premises application to windows azure platform (microsoft cloud). Masters thesis, Universiti Teknologi Malaysia, Faculty of Computing. http://libraryopac.utm.my/client/en_AU/main/search/results/?lm=&qu=Migrating+on+-premises+application+to+windows+azure+platform+%28microsoft+cloud%29&rt=&submit=
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic QA76 Computer software
spellingShingle QA76 Computer software
Pakbaz, Asghar
Migrating on -premises application to windows azure platform (microsoft cloud)
description Legacy systems are usually attached with outdated technologies which over time become a bottleneck for organizations to manage and maintain. Old and poorly utilized architecture make systems run slow and far from expected, however sometimes organization cannot live without those. Renewing application architecture can be considered as an option but it is time consuming and very costly. Cloud computing as an ultimate solution can be proposed to migrate on-premises application to a utilized environment in terms of infrastructure, computing power and virtualization. In addition, it provides a highly available and elastic computing environment which makes organizations to only pay for what they use. In this research, after a brief introduction to main concepts of cloud computing particularly Windows Azure platform (Microsoft Cloud), it is tried to analyze and assess OnePortfolio system developed by Riskk Sdn Bhd, to see whether it is feasible to be moved to Windows Azure. OnePortfolio operates on a SOA architecture comprised of three main components: services, client application and database. Throughout this research, Windows Azure migration lifecycle in compliance with ISO/IEC 14764 international standard is used as the methodology to perform the migration. Once the application is analyzed and migrated to cloud, it is compared to on-premises environment to evaluate its performance and security mechanism.
format Thesis
author Pakbaz, Asghar
author_facet Pakbaz, Asghar
author_sort Pakbaz, Asghar
title Migrating on -premises application to windows azure platform (microsoft cloud)
title_short Migrating on -premises application to windows azure platform (microsoft cloud)
title_full Migrating on -premises application to windows azure platform (microsoft cloud)
title_fullStr Migrating on -premises application to windows azure platform (microsoft cloud)
title_full_unstemmed Migrating on -premises application to windows azure platform (microsoft cloud)
title_sort migrating on -premises application to windows azure platform (microsoft cloud)
publishDate 2013
url http://eprints.utm.my/id/eprint/48238/1/AsgharPakbazMFC2013.pdf
http://eprints.utm.my/id/eprint/48238/
http://libraryopac.utm.my/client/en_AU/main/search/results/?lm=&qu=Migrating+on+-premises+application+to+windows+azure+platform+%28microsoft+cloud%29&rt=&submit=
_version_ 1643652501377908736
score 13.160551