Monitoring results of alborz earth dam during construction

Monitoring is one of the most important controlling factors in all earth structure studies. Monitoring is regarded as an important factor in controlling dam security, comparing real action with predicted planning and making good experience and opportunity for future planning. In this paper, we study...

Full description

Saved in:
Bibliographic Details
Main Authors: Latifi, Nima, Marto, Aminaton, Khari, Mahdy
Format: Article
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/47247/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.47247
record_format eprints
spelling my.utm.472472020-02-29T13:08:38Z http://eprints.utm.my/id/eprint/47247/ Monitoring results of alborz earth dam during construction Latifi, Nima Marto, Aminaton Khari, Mahdy TA Engineering (General). Civil engineering (General) Monitoring is one of the most important controlling factors in all earth structure studies. Monitoring is regarded as an important factor in controlling dam security, comparing real action with predicted planning and making good experience and opportunity for future planning. In this paper, we study the pore water pressure, total pressure and settlement in Alborz earth dam by making comparisons between the data taken from the instrument and back analysis on the model. Alborz dam is located in north of Iran. Alborz reservoir was selected to be built on Babolrod River in the conjunction of Gazo and Chakhani. It is within forty-fivekilometers south-east of Babol and 269 kilometers north-east of Tehran. The crest length and width are 838 and 12 (m), the dam height is 78 (m). All the back analysis are achieved by FLAC software from the beginning to the end of the construction, when the dam height is 50 (m). This instrument datum that is installed on earth dam shows that pore water pressure in the core has a normal approach during construction. When the core earth fill height is 50 (m), its maximum pore water pressure coefficient is about 0.5. It is less than its considered amount (0.6). It is expected that it will reach 0.4 at the end of the dam construction. Upstream and downstream shell and core settlement, achieved by data are in turn, 55, 35, and 48 (cm), placed on the earth dam permissible sections which are 1 to 2 percent of the dam height. Meanwhile, as it had been predicted, at the end of the dam construction, core settlement reached 135 cm. Generally, all of the installed instruments worked properly. 2012 Article PeerReviewed Latifi, Nima and Marto, Aminaton and Khari, Mahdy (2012) Monitoring results of alborz earth dam during construction. Electronic Journal of Geotechnical Engineering, 17 S . pp. 2474-2484. ISSN 1089-3032
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Latifi, Nima
Marto, Aminaton
Khari, Mahdy
Monitoring results of alborz earth dam during construction
description Monitoring is one of the most important controlling factors in all earth structure studies. Monitoring is regarded as an important factor in controlling dam security, comparing real action with predicted planning and making good experience and opportunity for future planning. In this paper, we study the pore water pressure, total pressure and settlement in Alborz earth dam by making comparisons between the data taken from the instrument and back analysis on the model. Alborz dam is located in north of Iran. Alborz reservoir was selected to be built on Babolrod River in the conjunction of Gazo and Chakhani. It is within forty-fivekilometers south-east of Babol and 269 kilometers north-east of Tehran. The crest length and width are 838 and 12 (m), the dam height is 78 (m). All the back analysis are achieved by FLAC software from the beginning to the end of the construction, when the dam height is 50 (m). This instrument datum that is installed on earth dam shows that pore water pressure in the core has a normal approach during construction. When the core earth fill height is 50 (m), its maximum pore water pressure coefficient is about 0.5. It is less than its considered amount (0.6). It is expected that it will reach 0.4 at the end of the dam construction. Upstream and downstream shell and core settlement, achieved by data are in turn, 55, 35, and 48 (cm), placed on the earth dam permissible sections which are 1 to 2 percent of the dam height. Meanwhile, as it had been predicted, at the end of the dam construction, core settlement reached 135 cm. Generally, all of the installed instruments worked properly.
format Article
author Latifi, Nima
Marto, Aminaton
Khari, Mahdy
author_facet Latifi, Nima
Marto, Aminaton
Khari, Mahdy
author_sort Latifi, Nima
title Monitoring results of alborz earth dam during construction
title_short Monitoring results of alborz earth dam during construction
title_full Monitoring results of alborz earth dam during construction
title_fullStr Monitoring results of alborz earth dam during construction
title_full_unstemmed Monitoring results of alborz earth dam during construction
title_sort monitoring results of alborz earth dam during construction
publishDate 2012
url http://eprints.utm.my/id/eprint/47247/
_version_ 1662754249360015360
score 13.187197