Modelling uncertainty factors in environmental issues on late delivery for construction industry: a propose
A very limited research of fixing uncertainties in environmental issues (EI) actually encountered biggest problems for company, especially in late delivery (LD) of project completion for construction industry (CI). Uncertainty could be happens causes by many factors which known or unknown, staticall...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Published: |
Springer-Verlag
2012
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/47237/ http://dx.doi.org/10.1007/978-3-642-32573-1_29 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.47237 |
---|---|
record_format |
eprints |
spelling |
my.utm.472372019-03-31T08:35:00Z http://eprints.utm.my/id/eprint/47237/ Modelling uncertainty factors in environmental issues on late delivery for construction industry: a propose Baharum, Zirawani Mustaffa, Noorfa Haszlinna Ngadiman, Mohd. Salihin Yacob, Azliza QA Mathematics A very limited research of fixing uncertainties in environmental issues (EI) actually encountered biggest problems for company, especially in late delivery (LD) of project completion for construction industry (CI). Uncertainty could be happens causes by many factors which known or unknown, statically to totally ignorance. Many factors of uncertainties have been modelled in previous research by ignored factors in EI. However, in the real cases all the factors must be manage even it is in-deterministic. Therefore, the modelling of uncertainty factors in EI for CI is very important to be studied, and it will be considered to be used as guidance for decision makers while they are facing with the problems that related to uncertainties. The uncertainty of EI can split into 2 categories; acts of God and acts of humans.. Preliminary result of conceptual model for uncertainty factors in EI is presented according to previous case study. Springer-Verlag 2012 Article PeerReviewed Baharum, Zirawani and Mustaffa, Noorfa Haszlinna and Ngadiman, Mohd. Salihin and Yacob, Azliza (2012) Modelling uncertainty factors in environmental issues on late delivery for construction industry: a propose. Lecture Notes of the Institute for Computer Sciences, Social-Informatics and Telecommunications Engineering, 62 LNI . pp. 182-187. ISSN 1867-8211 http://dx.doi.org/10.1007/978-3-642-32573-1_29 DOI:10.1007/978-3-642-32573-1_29 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
topic |
QA Mathematics |
spellingShingle |
QA Mathematics Baharum, Zirawani Mustaffa, Noorfa Haszlinna Ngadiman, Mohd. Salihin Yacob, Azliza Modelling uncertainty factors in environmental issues on late delivery for construction industry: a propose |
description |
A very limited research of fixing uncertainties in environmental issues (EI) actually encountered biggest problems for company, especially in late delivery (LD) of project completion for construction industry (CI). Uncertainty could be happens causes by many factors which known or unknown, statically to totally ignorance. Many factors of uncertainties have been modelled in previous research by ignored factors in EI. However, in the real cases all the factors must be manage even it is in-deterministic. Therefore, the modelling of uncertainty factors in EI for CI is very important to be studied, and it will be considered to be used as guidance for decision makers while they are facing with the problems that related to uncertainties. The uncertainty of EI can split into 2 categories; acts of God and acts of humans.. Preliminary result of conceptual model for uncertainty factors in EI is presented according to previous case study. |
format |
Article |
author |
Baharum, Zirawani Mustaffa, Noorfa Haszlinna Ngadiman, Mohd. Salihin Yacob, Azliza |
author_facet |
Baharum, Zirawani Mustaffa, Noorfa Haszlinna Ngadiman, Mohd. Salihin Yacob, Azliza |
author_sort |
Baharum, Zirawani |
title |
Modelling uncertainty factors in environmental issues on late delivery for construction industry: a propose |
title_short |
Modelling uncertainty factors in environmental issues on late delivery for construction industry: a propose |
title_full |
Modelling uncertainty factors in environmental issues on late delivery for construction industry: a propose |
title_fullStr |
Modelling uncertainty factors in environmental issues on late delivery for construction industry: a propose |
title_full_unstemmed |
Modelling uncertainty factors in environmental issues on late delivery for construction industry: a propose |
title_sort |
modelling uncertainty factors in environmental issues on late delivery for construction industry: a propose |
publisher |
Springer-Verlag |
publishDate |
2012 |
url |
http://eprints.utm.my/id/eprint/47237/ http://dx.doi.org/10.1007/978-3-642-32573-1_29 |
_version_ |
1643652266769514496 |
score |
13.188404 |