Design and evaluation of a CMMI conformant light-weight project management approach
CMMI is one of the well-known and accepted maturity models that many software organizations have implemented for its quality processes which are expected to bring a good quality for their software products. However, traditional software process models become too heavy-weight to be deployed. The aim...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Article |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/46782/ http://dx.doi.org/10.4156/jdcta.vol6.issue21.1 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.46782 |
---|---|
record_format |
eprints |
spelling |
my.utm.467822017-09-20T00:16:01Z http://eprints.utm.my/id/eprint/46782/ Design and evaluation of a CMMI conformant light-weight project management approach Piyabunditkul, Chayakorn Lichter, Horst Anwar, Toni Methawachananont, Apinporn Krootkaew, Chumphol Krisanathamakul, Tisanai TK Electrical engineering. Electronics Nuclear engineering CMMI is one of the well-known and accepted maturity models that many software organizations have implemented for its quality processes which are expected to bring a good quality for their software products. However, traditional software process models become too heavy-weight to be deployed. The aim of this research is to design the Light-Weight Project Management (LWPM) approach to implement CMMI by mapping between CMMI goals and Agile-Scrum based on defined artifacts and to indicate the differences in applying LWPM and the traditional Waterfall model. Our approach focuses on the Project Management category which composes Project Planning (PP), Project Monitoring and Control (PMC) and Integrated Project Management (IPM). In order to compare both models we collected relevant data by using questionnaire and also the dedicated tool SPIALS (Software Process Improvement Adaptive Learning System). 2012 Article PeerReviewed Piyabunditkul, Chayakorn and Lichter, Horst and Anwar, Toni and Methawachananont, Apinporn and Krootkaew, Chumphol and Krisanathamakul, Tisanai (2012) Design and evaluation of a CMMI conformant light-weight project management approach. International Journal of Digital Content Technology and its Applications, 6 (21). pp. 1-10. ISSN 1975-9339 http://dx.doi.org/10.4156/jdcta.vol6.issue21.1 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
topic |
TK Electrical engineering. Electronics Nuclear engineering |
spellingShingle |
TK Electrical engineering. Electronics Nuclear engineering Piyabunditkul, Chayakorn Lichter, Horst Anwar, Toni Methawachananont, Apinporn Krootkaew, Chumphol Krisanathamakul, Tisanai Design and evaluation of a CMMI conformant light-weight project management approach |
description |
CMMI is one of the well-known and accepted maturity models that many software organizations have implemented for its quality processes which are expected to bring a good quality for their software products. However, traditional software process models become too heavy-weight to be deployed. The aim of this research is to design the Light-Weight Project Management (LWPM) approach to implement CMMI by mapping between CMMI goals and Agile-Scrum based on defined artifacts and to indicate the differences in applying LWPM and the traditional Waterfall model. Our approach focuses on the Project Management category which composes Project Planning (PP), Project Monitoring and Control (PMC) and Integrated Project Management (IPM). In order to compare both models we collected relevant data by using questionnaire and also the dedicated tool SPIALS (Software Process Improvement Adaptive Learning System). |
format |
Article |
author |
Piyabunditkul, Chayakorn Lichter, Horst Anwar, Toni Methawachananont, Apinporn Krootkaew, Chumphol Krisanathamakul, Tisanai |
author_facet |
Piyabunditkul, Chayakorn Lichter, Horst Anwar, Toni Methawachananont, Apinporn Krootkaew, Chumphol Krisanathamakul, Tisanai |
author_sort |
Piyabunditkul, Chayakorn |
title |
Design and evaluation of a CMMI conformant light-weight project management approach |
title_short |
Design and evaluation of a CMMI conformant light-weight project management approach |
title_full |
Design and evaluation of a CMMI conformant light-weight project management approach |
title_fullStr |
Design and evaluation of a CMMI conformant light-weight project management approach |
title_full_unstemmed |
Design and evaluation of a CMMI conformant light-weight project management approach |
title_sort |
design and evaluation of a cmmi conformant light-weight project management approach |
publishDate |
2012 |
url |
http://eprints.utm.my/id/eprint/46782/ http://dx.doi.org/10.4156/jdcta.vol6.issue21.1 |
_version_ |
1643652138568515584 |
score |
13.160551 |