Case study to determine the camber of post- tensioned 'I' beam
A common problem that most contractors faced in beam bridge construction was to predict the actual camber of pre-tensioned or post-tensioned beams due to prestressing in order to achieve bridge design finished levels without any unforeseen additional construction cost. Four numbers of full scale 36m...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2005
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/4589/1/LeePohHuatMFKA2005.pdf http://eprints.utm.my/id/eprint/4589/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!