The causel factors of increase in project cost and its impact on project financial feasibility : case study of toll road development projects in Indonesia
Saved in:
Main Author: | Rubiyantinah, Maria |
---|---|
Format: | Thesis |
Published: |
1997
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/44473/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A lesson from the Sedyatmo package 4 additional elevated lane toll road project
by: Tri Prakoso, Endar
Published: (2011) -
Review of speed limit for FR222 access road to Gambang toll
by: Hazlyza, Zainon
Published: (2012) -
Modelling toll operations in Malaysia
by: Abdul Hamid, Ahmad Hilmy
Published: (1995) -
LRT project back on track, expected to start soon
by: The Borneo Post
Published: (2019) -
LRT project may use new AI tech to 'read' tracks-CM
by: The Borneo Post
Published: (2019)