Productivity assessment and schedule compression index for construction project planning

Productivity assessment and performance evaluation models identified from previous researches were normally performed separately to reduce complication and cost. However, performing both the productivity assessment and performance evaluation would benefit a project progress significantly. Furthermor...

Full description

Saved in:
Bibliographic Details
Main Author: Mansur, Shaiful Amri
Format: Thesis
Language:English
Published: 2004
Subjects:
Online Access:http://eprints.utm.my/id/eprint/4325/1/ShaifulAmriMansurPFKE2004.pdf
http://eprints.utm.my/id/eprint/4325/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.4325
record_format eprints
spelling my.utm.43252018-01-17T08:37:01Z http://eprints.utm.my/id/eprint/4325/ Productivity assessment and schedule compression index for construction project planning Mansur, Shaiful Amri TA Engineering (General). Civil engineering (General) Productivity assessment and performance evaluation models identified from previous researches were normally performed separately to reduce complication and cost. However, performing both the productivity assessment and performance evaluation would benefit a project progress significantly. Furthermore, effective schedule compression methods should be identified to maximise productivity and reduce additional costs. The aim of the research was to develop a project management tool that combined productivity assessment and schedule compression methods for reporting productivity status and evaluating project performance. The report is produced based on the level of Factors Affecting Productivity (FAP) and Schedule Compression Methods (SCM) obtained from the project. The research was divided into three stages, which involved a pilot, first round, and second round questionnaire surveys. The respondents of the surveys were mostly project and site managers from registered construction firms in several states of the Malaysia Peninsular. The first stage of the research involved identifying the importance and optimum level of project planning, differences between productivity and performance, fundamentals of productivity assessments, plus FAP and SCM from literature review. The pilot survey was used to determine the relevance, suitability and applicability of the information obtained from literature review to the local building construction industry using index of importance method. The second stage of the research involved two rounds of surveys. The objective of the first round survey was to obtain the minimum and maximum limit for FAP and SCM elements weighting process, and to develop the questionnaire for second round survey. The objective of the second round survey was to obtain historical data from completed building construction projects. A table of predicted time performance ratio (TPR) was produced using fuzzy inference system, which was to be used as a project performance index table. The results showed that FAP and SCM were positively correlated, and so were FAP and TPR. In conclusions, there was a need for effective and cheaper project management tools. Productivity assessment and SCM were implemented only by less than fifty percent of the survey respondents. Correct selection of construction methods, scheduling implementation, starting work as planned, complexity of construction and contractor’s budget allocation were considered as having high impact on FAP, while the most effective SCM claimed by the respondents was staffing the project with most efficient crew members. A status report that contained both productivity and performance status of a project was successfully produced. 2004-12 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/4325/1/ShaifulAmriMansurPFKE2004.pdf Mansur, Shaiful Amri (2004) Productivity assessment and schedule compression index for construction project planning. PhD thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Mansur, Shaiful Amri
Productivity assessment and schedule compression index for construction project planning
description Productivity assessment and performance evaluation models identified from previous researches were normally performed separately to reduce complication and cost. However, performing both the productivity assessment and performance evaluation would benefit a project progress significantly. Furthermore, effective schedule compression methods should be identified to maximise productivity and reduce additional costs. The aim of the research was to develop a project management tool that combined productivity assessment and schedule compression methods for reporting productivity status and evaluating project performance. The report is produced based on the level of Factors Affecting Productivity (FAP) and Schedule Compression Methods (SCM) obtained from the project. The research was divided into three stages, which involved a pilot, first round, and second round questionnaire surveys. The respondents of the surveys were mostly project and site managers from registered construction firms in several states of the Malaysia Peninsular. The first stage of the research involved identifying the importance and optimum level of project planning, differences between productivity and performance, fundamentals of productivity assessments, plus FAP and SCM from literature review. The pilot survey was used to determine the relevance, suitability and applicability of the information obtained from literature review to the local building construction industry using index of importance method. The second stage of the research involved two rounds of surveys. The objective of the first round survey was to obtain the minimum and maximum limit for FAP and SCM elements weighting process, and to develop the questionnaire for second round survey. The objective of the second round survey was to obtain historical data from completed building construction projects. A table of predicted time performance ratio (TPR) was produced using fuzzy inference system, which was to be used as a project performance index table. The results showed that FAP and SCM were positively correlated, and so were FAP and TPR. In conclusions, there was a need for effective and cheaper project management tools. Productivity assessment and SCM were implemented only by less than fifty percent of the survey respondents. Correct selection of construction methods, scheduling implementation, starting work as planned, complexity of construction and contractor’s budget allocation were considered as having high impact on FAP, while the most effective SCM claimed by the respondents was staffing the project with most efficient crew members. A status report that contained both productivity and performance status of a project was successfully produced.
format Thesis
author Mansur, Shaiful Amri
author_facet Mansur, Shaiful Amri
author_sort Mansur, Shaiful Amri
title Productivity assessment and schedule compression index for construction project planning
title_short Productivity assessment and schedule compression index for construction project planning
title_full Productivity assessment and schedule compression index for construction project planning
title_fullStr Productivity assessment and schedule compression index for construction project planning
title_full_unstemmed Productivity assessment and schedule compression index for construction project planning
title_sort productivity assessment and schedule compression index for construction project planning
publishDate 2004
url http://eprints.utm.my/id/eprint/4325/1/ShaifulAmriMansurPFKE2004.pdf
http://eprints.utm.my/id/eprint/4325/
_version_ 1643644025574522880
score 13.15806