Analysis of factors of non-excusable delays that influence contractors' performance
Saved in:
Main Author: | Ng, Weng Seng |
---|---|
Format: | Thesis |
Published: |
2001
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/43173/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis Of Non-excusable Delay Factors Influencing Contractors'
Performance In Lagos State, Nigeria
by: Ibironke, Olajide Timothy, et al.
Published: (2013) -
Excusable delays in construction (A case study)
by: Ahmed Memon, Zubair
Published: (2000) -
An analysis of the causes of non-excusable delays by contractor for public projects in Sarawak/ Mohamad Rafiq Mohamad Radzuan
by: Mohamad Radzuan, Mohamad Rafiq
Published: (2020) -
Major causes of construction delays under client category and contractor category
by: M., Abedi, et al.
Published: (2011) -
The causes and effects for the delays in JKR construction projects by contractors in
Kuching, Sarawak
by: Tsen, Chee Hou
Published: (2022)