Well completion practices
This book was translated from English to Malay. It is an early section of Chapter 1 (Well completion practices). Other chapters covered are Wellhead and ubing accessories, Perforation, and Sand control.
Saved in:
Main Authors: | Md. Yassin, Abu Azam, Mohd. Arshad, Azmi, Ismail, Issham |
---|---|
Format: | Book Section |
Language: | English |
Published: |
UTM Publisher
1997
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/4057/1/SKMBT_60007072308220.pdf http://eprints.utm.my/id/eprint/4057/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Formation damage during drilling and completion practices - a review
by: Md. Yassin, Abu Azam
Published: (1988) -
DESIGN AND ANALYSIS OF SURFACE FACILITIES AND
DOWNHOLE COMPLETION OF UTP TEST WELL
by: Azmi, Mohd Shaiful Anuar
Published: (2011) -
DESIGN AND ANALYSIS OF SURFACE FAILITIES AND DOWNHOLE COMPLETION OF UTP TEST WELL
by: Azmi, Mohd. Shaiful Anuar
Published: (2011) -
DAM5303-WELL COMPLETION
by: Past Year Exam Question,
Published: (2022) -
DAM5303 -WELL COMPLETION
by: Past Year Exam Question
Published: (2023)