Time impact of scheduling simulation for high rise building
Although the long-introduced Industrialised Building System (IBS) has promised to solve and improve the current construction method and scenario in our country, but the IBS method has not gained enough popularity. One of the reasons is due to lack of research works done to quantifying the benefit of...
Saved in:
Main Authors: | Ismail, Asmadi, Mohamad, Mohamad Ibrahim, Yahya, Muhamad Azani |
---|---|
Format: | Article |
Language: | English |
Published: |
Universiti Tun Hussein Onn Malaysia (UTHM) and Concrete Society of Malaysia (CSM)
2010
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/39751/2/19 http://eprints.utm.my/id/eprint/39751/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Schedulling simulation for high-rise building comparison on time impact
by: Ismail, Asmadi
Published: (2009) -
High rise building deformation monitoring with GPS
by: Wan Akib, Wan Abdul Aziz, et al.
Published: (2004) -
Wind Load Effects On High-Rise Building
by: Tan, Yee Jin
Published: (2020) -
High Crane Stability Monitoring in High Rise Building Construction
by: Wong, Charlie Chiong Ho
Published: (2018) -
Fire safety in high rise residential building in Malaysia
by: Hashemian, Seyed Mohammad
Published: (2014)