Logistic and maintenance management to increase readiness army combat armoured vehicle
The purpose of the conference is to share knowledge and experience in research as well as to establish academic network between the two universities. Participations are mainly from post graduate students from both institutions to encourage them to present and defend their work confidently and improv...
Saved in:
Main Author: | Mohammad, Roslina |
---|---|
Format: | Conference or Workshop Item |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/39603/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Develop improvement maintenance management of Agusta A109 Helicopter at Army Aviation Unit to minimize out sourcing
by: Mohammad, Roslina
Published: (2013) -
Production Layout Efficiency Improvement for Armoured Vehicle Assembly Line
by: Ahmad Shah Hizam, Md. Yasir, et al.
Published: (2017) -
Development of framework for armoured vehicle assembly line efficiency improvement by using simulation analysis: Part 1
by: A. S. H. M., Yasir, et al.
Published: (2019) -
Disturbance rejection control of a light armoured vehicle using stability augmentation based active suspension system
by: Hudha, Khisbullah, et al.
Published: (2008) -
Characterising Ballistic Limits of Lightweight Laminated-Structure as a Protective Panel for Armoured Vehicle / N.A. Rahman...[et al.]
by: A. Rahman, N., et al.
Published: (2017)