Development of contractor's proposal process model in design-build procurement

Design-build procurement has been dramatically increased recently and has taken over conventional delivery system in both government and private sectors in our construction industry. Despite the advantages of design-build procurement system, there is a great potential for dispute and claim at the co...

Full description

Saved in:
Bibliographic Details
Main Author: Then, Dennis Choo Khun
Format: Thesis
Language:English
Published: 2005
Subjects:
Online Access:http://eprints.utm.my/id/eprint/3798/1/DennisThenChooKhunMFKA2005.pdf
http://eprints.utm.my/id/eprint/3798/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.3798
record_format eprints
spelling my.utm.37982018-01-10T07:24:08Z http://eprints.utm.my/id/eprint/3798/ Development of contractor's proposal process model in design-build procurement Then, Dennis Choo Khun TA Engineering (General). Civil engineering (General) Design-build procurement has been dramatically increased recently and has taken over conventional delivery system in both government and private sectors in our construction industry. Despite the advantages of design-build procurement system, there is a great potential for dispute and claim at the construction stage due to the client’s requirement and contractor’s proposal not being well defined at the early stage. Therefore, a process model of dominant contents is developed to guide and assist design-build contractor in preparation of proposal. Essentially, the objectives of this research are to study the concept of design-build system, to study the dominant contents of design-build contractor’s proposal, to identify the degree of importance of the dominant contents and to develop a process model in determining contractor’s proposal in design-build procurement. The scope of the study is only focusing on the typical contents of contractor’s proposal, such as design proposals, financial details, alternative proposals, details on assumptions made, fabrication / construction proposals, contract administration details, details on qualifications / deviations and miscellaneous matters. This study was carried out by going through literature reviews, semi-structured interview and questionnaire survey exercises. The target respondents are developers, architects, contractors, quantity surveyors and design consultants working in the state of Wilayah Persekutuan and Sarawak. Through the process of data collection and analysis, the degrees of importance of the dominant contents have been determined. The results obtained form a basis for the development of a design-build contractor’s proposal process model, by using Data Flow Diagram (DFD) approach. It has been developed to well formulate effective strategies, in order to minimize contractual conflicts and improve project performances in design-build projects. 2005-11 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/3798/1/DennisThenChooKhunMFKA2005.pdf Then, Dennis Choo Khun (2005) Development of contractor's proposal process model in design-build procurement. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Then, Dennis Choo Khun
Development of contractor's proposal process model in design-build procurement
description Design-build procurement has been dramatically increased recently and has taken over conventional delivery system in both government and private sectors in our construction industry. Despite the advantages of design-build procurement system, there is a great potential for dispute and claim at the construction stage due to the client’s requirement and contractor’s proposal not being well defined at the early stage. Therefore, a process model of dominant contents is developed to guide and assist design-build contractor in preparation of proposal. Essentially, the objectives of this research are to study the concept of design-build system, to study the dominant contents of design-build contractor’s proposal, to identify the degree of importance of the dominant contents and to develop a process model in determining contractor’s proposal in design-build procurement. The scope of the study is only focusing on the typical contents of contractor’s proposal, such as design proposals, financial details, alternative proposals, details on assumptions made, fabrication / construction proposals, contract administration details, details on qualifications / deviations and miscellaneous matters. This study was carried out by going through literature reviews, semi-structured interview and questionnaire survey exercises. The target respondents are developers, architects, contractors, quantity surveyors and design consultants working in the state of Wilayah Persekutuan and Sarawak. Through the process of data collection and analysis, the degrees of importance of the dominant contents have been determined. The results obtained form a basis for the development of a design-build contractor’s proposal process model, by using Data Flow Diagram (DFD) approach. It has been developed to well formulate effective strategies, in order to minimize contractual conflicts and improve project performances in design-build projects.
format Thesis
author Then, Dennis Choo Khun
author_facet Then, Dennis Choo Khun
author_sort Then, Dennis Choo Khun
title Development of contractor's proposal process model in design-build procurement
title_short Development of contractor's proposal process model in design-build procurement
title_full Development of contractor's proposal process model in design-build procurement
title_fullStr Development of contractor's proposal process model in design-build procurement
title_full_unstemmed Development of contractor's proposal process model in design-build procurement
title_sort development of contractor's proposal process model in design-build procurement
publishDate 2005
url http://eprints.utm.my/id/eprint/3798/1/DennisThenChooKhunMFKA2005.pdf
http://eprints.utm.my/id/eprint/3798/
_version_ 1643643893545172992
score 13.19449