The performance of Felda Plantations Sdn. Bhd. contractors

Performance is the measure of the ability of the contractors to execute work on time, cost and quality. This study presents the result of the investigation on performance of the contractor that registered under Felda Plantations Sdn. Bhd based on workmanship. The objectives of the study are to ident...

Full description

Saved in:
Bibliographic Details
Main Author: Ibrahim, Ramzi
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/id/eprint/3718/1/RamziIbrahimMFKA2006.pdf
http://eprints.utm.my/id/eprint/3718/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.3718
record_format eprints
spelling my.utm.37182018-01-10T04:37:19Z http://eprints.utm.my/id/eprint/3718/ The performance of Felda Plantations Sdn. Bhd. contractors Ibrahim, Ramzi HD Industries. Land use. Labor TA Engineering (General). Civil engineering (General) Performance is the measure of the ability of the contractors to execute work on time, cost and quality. This study presents the result of the investigation on performance of the contractor that registered under Felda Plantations Sdn. Bhd based on workmanship. The objectives of the study are to identify the factors that influence the contractor’s performance; to establish the critical factors that influence their performance; and to identify the strategies to improve the situation. The method of the study involved literature review, data collection and analysis is using an Average Index method. The result for this study is found that the three most important factors that influence the contractors performance were the experience and skilled worker; understand the method of work; and good planning and scheduling . The three best method to improve the contractor’s performance were to focus on the client needs; meet the client requirements; and exceed the client expectation; to improve the method of supervision of labors work and to improve the planning and scheduling techniques. It is hope that this study will provide useful information on future work for contractors not only for their future jobs at Felda Plantations Sdn. Bhd. but to the benefit to the construction industry 2006-05 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/3718/1/RamziIbrahimMFKA2006.pdf Ibrahim, Ramzi (2006) The performance of Felda Plantations Sdn. Bhd. contractors. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic HD Industries. Land use. Labor
TA Engineering (General). Civil engineering (General)
spellingShingle HD Industries. Land use. Labor
TA Engineering (General). Civil engineering (General)
Ibrahim, Ramzi
The performance of Felda Plantations Sdn. Bhd. contractors
description Performance is the measure of the ability of the contractors to execute work on time, cost and quality. This study presents the result of the investigation on performance of the contractor that registered under Felda Plantations Sdn. Bhd based on workmanship. The objectives of the study are to identify the factors that influence the contractor’s performance; to establish the critical factors that influence their performance; and to identify the strategies to improve the situation. The method of the study involved literature review, data collection and analysis is using an Average Index method. The result for this study is found that the three most important factors that influence the contractors performance were the experience and skilled worker; understand the method of work; and good planning and scheduling . The three best method to improve the contractor’s performance were to focus on the client needs; meet the client requirements; and exceed the client expectation; to improve the method of supervision of labors work and to improve the planning and scheduling techniques. It is hope that this study will provide useful information on future work for contractors not only for their future jobs at Felda Plantations Sdn. Bhd. but to the benefit to the construction industry
format Thesis
author Ibrahim, Ramzi
author_facet Ibrahim, Ramzi
author_sort Ibrahim, Ramzi
title The performance of Felda Plantations Sdn. Bhd. contractors
title_short The performance of Felda Plantations Sdn. Bhd. contractors
title_full The performance of Felda Plantations Sdn. Bhd. contractors
title_fullStr The performance of Felda Plantations Sdn. Bhd. contractors
title_full_unstemmed The performance of Felda Plantations Sdn. Bhd. contractors
title_sort performance of felda plantations sdn. bhd. contractors
publishDate 2006
url http://eprints.utm.my/id/eprint/3718/1/RamziIbrahimMFKA2006.pdf
http://eprints.utm.my/id/eprint/3718/
_version_ 1643643876616962048
score 13.18916