Simulation of industrialised building system components production
The construction of IBS building starts with the production of the IBS components and the production process is the main activity concern in the IBS production plant. Having an optimum production line to manufacture the required IBS elements within targeted time and limited number of reusable steel...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/3593/1/NgSoonChingMFKA2006ABS.pdf http://eprints.utm.my/id/eprint/3593/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|