A study on identifying factors affecting project performance on road construction project
This study identifies the project performance of road construction projects which are owned by Government of Indonesia and focuses only on the owner’s perspective. The objectives of the owner are the project completed within specified time and actual cost is not exceed the budget and, which differs...
Saved in:
Main Author: | Taufik, Mohamad |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/34574/1/MohamadTaufikMFAB2012.pdf http://eprints.utm.my/id/eprint/34574/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:69752?site_name=Restricted Repository |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
External factors affecting construction project performance in Iraq using pestle factors
by: Khalid, Layth Salman
Published: (2020) -
Influential factors affecting materials management in construction projects
by: Mat Jusoh, Zairra, et al.
Published: (2017) -
Structural model of factors affecting pmo performance in uae mega construction projects
by: Saleh Almansoori, Maitha Taher
Published: (2022) -
Factors Affecting the Selection of the Procurement Methods for Construction Projects in Malaysia
by: Yap, Zhi Shan, et al.
Published: (2019) -
Factors that affect the performance of public project in Malaysia
by: Norsyahidatul Nazirah , Ismail
Published: (2012)