Selection of the industrialized building material supplier by analytic hierarchy process method

Industrialized Building system (IBS) aims to expedite the process of installation and construction at site. Industrialized Building System (IBS) is a construction system that is built using pre-fabricated components. The manufacturing of the components is systematically done using machine, formworks...

Full description

Saved in:
Bibliographic Details
Main Author: Moravveji, Mohammad Yousef
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/id/eprint/33277/1/MohammadYousefMoravvejiMFKA2013.pdf
http://eprints.utm.my/id/eprint/33277/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:76595?queryType=vitalDismax&query=Selection+of+the+industrialized+building+material+supplier+by+analytic+hierarchy+process+method&public=true
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.33277
record_format eprints
spelling my.utm.332772017-07-02T07:59:59Z http://eprints.utm.my/id/eprint/33277/ Selection of the industrialized building material supplier by analytic hierarchy process method Moravveji, Mohammad Yousef TH Building construction Industrialized Building system (IBS) aims to expedite the process of installation and construction at site. Industrialized Building System (IBS) is a construction system that is built using pre-fabricated components. The manufacturing of the components is systematically done using machine, formworks, and other forms of mechanical equipment. The components are manufactured off-site and once completed will be delivered to construction sites for assembly and erection so that it could be a area of concern to select the appropriate material from qualified supplier with consideration of critical factor. This project focuses on the issue of industrialized building material while it takes account of minimizing the cost and time of the purchasing and erection process. As the supplier selection is the multi criteria problem the research writer tend to use the Analytic Hierarchy Process which is the most popular decision making method to deal with the issue of IBS-M supplier selection. The imperative criteria for supplier selection problem have been identified to comply with the characteristics of Industrialized Building Material (IBM) Suppliers. A systematic approach has been developed by using Analytic Hierarchy Process method to facilitate the supplier selection taking into account of all identified criteria. Supplier Selection Model (SSM) is proposed to choose the best Industrialized Building Material (IBM) Suppliers for Industrialized Building System IBS companies. The practicability of the developed model has been proved through case study. 2013 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/33277/1/MohammadYousefMoravvejiMFKA2013.pdf Moravveji, Mohammad Yousef (2013) Selection of the industrialized building material supplier by analytic hierarchy process method. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:76595?queryType=vitalDismax&query=Selection+of+the+industrialized+building+material+supplier+by+analytic+hierarchy+process+method&public=true
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Moravveji, Mohammad Yousef
Selection of the industrialized building material supplier by analytic hierarchy process method
description Industrialized Building system (IBS) aims to expedite the process of installation and construction at site. Industrialized Building System (IBS) is a construction system that is built using pre-fabricated components. The manufacturing of the components is systematically done using machine, formworks, and other forms of mechanical equipment. The components are manufactured off-site and once completed will be delivered to construction sites for assembly and erection so that it could be a area of concern to select the appropriate material from qualified supplier with consideration of critical factor. This project focuses on the issue of industrialized building material while it takes account of minimizing the cost and time of the purchasing and erection process. As the supplier selection is the multi criteria problem the research writer tend to use the Analytic Hierarchy Process which is the most popular decision making method to deal with the issue of IBS-M supplier selection. The imperative criteria for supplier selection problem have been identified to comply with the characteristics of Industrialized Building Material (IBM) Suppliers. A systematic approach has been developed by using Analytic Hierarchy Process method to facilitate the supplier selection taking into account of all identified criteria. Supplier Selection Model (SSM) is proposed to choose the best Industrialized Building Material (IBM) Suppliers for Industrialized Building System IBS companies. The practicability of the developed model has been proved through case study.
format Thesis
author Moravveji, Mohammad Yousef
author_facet Moravveji, Mohammad Yousef
author_sort Moravveji, Mohammad Yousef
title Selection of the industrialized building material supplier by analytic hierarchy process method
title_short Selection of the industrialized building material supplier by analytic hierarchy process method
title_full Selection of the industrialized building material supplier by analytic hierarchy process method
title_fullStr Selection of the industrialized building material supplier by analytic hierarchy process method
title_full_unstemmed Selection of the industrialized building material supplier by analytic hierarchy process method
title_sort selection of the industrialized building material supplier by analytic hierarchy process method
publishDate 2013
url http://eprints.utm.my/id/eprint/33277/1/MohammadYousefMoravvejiMFKA2013.pdf
http://eprints.utm.my/id/eprint/33277/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:76595?queryType=vitalDismax&query=Selection+of+the+industrialized+building+material+supplier+by+analytic+hierarchy+process+method&public=true
_version_ 1643649283228958720
score 13.160551