Design process improvement by integrating principles of constructability knowledge to the monorail system project

The use of constructability analysis is the process of determining that the designers utilize common construction practices that are readily available in the contracting industry to complete a project. The use of constructability analysis provides an opportunity for input from the contracting indust...

Full description

Saved in:
Bibliographic Details
Main Author: Husin, Sufian
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/id/eprint/33122/1/SufianHusinMFKA2013.pdf
http://eprints.utm.my/id/eprint/33122/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:79340?queryType=vitalDismax&query=+Design+process+improvement+by+integrating+principles+of+constructability+knowledge+to+the+monorail+system+project&public=true
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.33122
record_format eprints
spelling my.utm.331222017-06-15T02:13:32Z http://eprints.utm.my/id/eprint/33122/ Design process improvement by integrating principles of constructability knowledge to the monorail system project Husin, Sufian Unspecified The use of constructability analysis is the process of determining that the designers utilize common construction practices that are readily available in the contracting industry to complete a project. The use of constructability analysis provides an opportunity for input from the contracting industry to the design professional to ensure that efficient, economical and quality solutions are reached. The timely execution of a construction project is very important to the client, who makes plans and commitments on the basis of the project’s anticipated completion date. Failure of design professionals to consider how a builder will implement the design can result in scheduling problems, contract changes, increase of cost, delay, variations even dispute during the construction process. Many design firms have indulged in constructability program that is launched as early as conceptual planning stage of the project. Hence, the aim of this study is to enhance monorail design process through integration of constructability concept. The objective could be determined by investigating whether any research and study has ever been approached on the implementation of constructability review analysis on any monorail projects in Malaysia. Subsequently to identify whether there is an element of Constructability Review Analysis being implemented to the monorail project in Malaysia. Furtherance to this, a Constructability Review Checklist is to be created specifically for the monorail projects, ensuring its integration into design process. There are three (3) phases of this investigation. Phase one (1) starts with the determining the objective and scope and subsequently research through literature reviews and preliminary interviews. Phase two (2) consist of studying the case study by investigation from the existing and on-going KL monorail project and constructability issues. Phase three (3) comprises of developing and validating on improving the design process and fine tuning the design constructability checklist by interviewing an expert on monorail consultants. Finally, the conclusion was there has been no study and research being approached into the constructability review analysis on any monorail projects in Malaysia. However, it was identified there are elements of constructability review analysis being implemented in the KL Monorail Project. Hence, a constructability review checklist was developed ensuring its integration into the constructability review design process 2013 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/33122/1/SufianHusinMFKA2013.pdf Husin, Sufian (2013) Design process improvement by integrating principles of constructability knowledge to the monorail system project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:79340?queryType=vitalDismax&query=+Design+process+improvement+by+integrating+principles+of+constructability+knowledge+to+the+monorail+system+project&public=true
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic Unspecified
spellingShingle Unspecified
Husin, Sufian
Design process improvement by integrating principles of constructability knowledge to the monorail system project
description The use of constructability analysis is the process of determining that the designers utilize common construction practices that are readily available in the contracting industry to complete a project. The use of constructability analysis provides an opportunity for input from the contracting industry to the design professional to ensure that efficient, economical and quality solutions are reached. The timely execution of a construction project is very important to the client, who makes plans and commitments on the basis of the project’s anticipated completion date. Failure of design professionals to consider how a builder will implement the design can result in scheduling problems, contract changes, increase of cost, delay, variations even dispute during the construction process. Many design firms have indulged in constructability program that is launched as early as conceptual planning stage of the project. Hence, the aim of this study is to enhance monorail design process through integration of constructability concept. The objective could be determined by investigating whether any research and study has ever been approached on the implementation of constructability review analysis on any monorail projects in Malaysia. Subsequently to identify whether there is an element of Constructability Review Analysis being implemented to the monorail project in Malaysia. Furtherance to this, a Constructability Review Checklist is to be created specifically for the monorail projects, ensuring its integration into design process. There are three (3) phases of this investigation. Phase one (1) starts with the determining the objective and scope and subsequently research through literature reviews and preliminary interviews. Phase two (2) consist of studying the case study by investigation from the existing and on-going KL monorail project and constructability issues. Phase three (3) comprises of developing and validating on improving the design process and fine tuning the design constructability checklist by interviewing an expert on monorail consultants. Finally, the conclusion was there has been no study and research being approached into the constructability review analysis on any monorail projects in Malaysia. However, it was identified there are elements of constructability review analysis being implemented in the KL Monorail Project. Hence, a constructability review checklist was developed ensuring its integration into the constructability review design process
format Thesis
author Husin, Sufian
author_facet Husin, Sufian
author_sort Husin, Sufian
title Design process improvement by integrating principles of constructability knowledge to the monorail system project
title_short Design process improvement by integrating principles of constructability knowledge to the monorail system project
title_full Design process improvement by integrating principles of constructability knowledge to the monorail system project
title_fullStr Design process improvement by integrating principles of constructability knowledge to the monorail system project
title_full_unstemmed Design process improvement by integrating principles of constructability knowledge to the monorail system project
title_sort design process improvement by integrating principles of constructability knowledge to the monorail system project
publishDate 2013
url http://eprints.utm.my/id/eprint/33122/1/SufianHusinMFKA2013.pdf
http://eprints.utm.my/id/eprint/33122/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:79340?queryType=vitalDismax&query=+Design+process+improvement+by+integrating+principles+of+constructability+knowledge+to+the+monorail+system+project&public=true
_version_ 1643649236876656640
score 13.159267