Construction information systems for executive management in monitoring work progress

A descriptive research has been carried out to provide an investigation on performance of computerized information systems to meet the requirements of executive management in monitoring Construction Work Progress (CWP). Through the literature review that highlights the basic needs for the system, in...

Full description

Saved in:
Bibliographic Details
Main Authors: Abd. Majid, Muhd. Zaimi, Zakaria, W. Z., Lamit, Hasanuddin, Keyvanfar, A., Shafaghat, A., Bakti, E. S.
Format: Article
Published: American Scientific Publishers 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/33019/
http://dx.doi.org/10.1166/asl.2012.4096
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.33019
record_format eprints
spelling my.utm.330192018-11-30T06:35:21Z http://eprints.utm.my/id/eprint/33019/ Construction information systems for executive management in monitoring work progress Abd. Majid, Muhd. Zaimi Zakaria, W. Z. Lamit, Hasanuddin Keyvanfar, A. Shafaghat, A. Bakti, E. S. TA Engineering (General). Civil engineering (General) A descriptive research has been carried out to provide an investigation on performance of computerized information systems to meet the requirements of executive management in monitoring Construction Work Progress (CWP). Through the literature review that highlights the basic needs for the system, in which two objectives were identified are: to investigate the problems faced by executive management using an information system for monitoring construction progress, and to investigate the traditional and computerized methods of monitoring construction progress in the construction industry. The data gathered from 56 respondent using questionnaires were obtained via post-mailing and face to face interview. The "High Research Power" (HRP) analysis and Average Index Method were used to analyze the data. In conclusion, the finding highlighted several problems which include 'Ineffective communication' faced by executive management for monitoring work progress. Other findings, the most common methods used for monitoring construction progress include 'Site meeting'. American Scientific Publishers 2012-08 Article PeerReviewed Abd. Majid, Muhd. Zaimi and Zakaria, W. Z. and Lamit, Hasanuddin and Keyvanfar, A. and Shafaghat, A. and Bakti, E. S. (2012) Construction information systems for executive management in monitoring work progress. Advanced Science Letters, 15 (1). pp. 169-171. ISSN 1936-6612 http://dx.doi.org/10.1166/asl.2012.4096 DOI:10.1166/asl.2012.4096
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Abd. Majid, Muhd. Zaimi
Zakaria, W. Z.
Lamit, Hasanuddin
Keyvanfar, A.
Shafaghat, A.
Bakti, E. S.
Construction information systems for executive management in monitoring work progress
description A descriptive research has been carried out to provide an investigation on performance of computerized information systems to meet the requirements of executive management in monitoring Construction Work Progress (CWP). Through the literature review that highlights the basic needs for the system, in which two objectives were identified are: to investigate the problems faced by executive management using an information system for monitoring construction progress, and to investigate the traditional and computerized methods of monitoring construction progress in the construction industry. The data gathered from 56 respondent using questionnaires were obtained via post-mailing and face to face interview. The "High Research Power" (HRP) analysis and Average Index Method were used to analyze the data. In conclusion, the finding highlighted several problems which include 'Ineffective communication' faced by executive management for monitoring work progress. Other findings, the most common methods used for monitoring construction progress include 'Site meeting'.
format Article
author Abd. Majid, Muhd. Zaimi
Zakaria, W. Z.
Lamit, Hasanuddin
Keyvanfar, A.
Shafaghat, A.
Bakti, E. S.
author_facet Abd. Majid, Muhd. Zaimi
Zakaria, W. Z.
Lamit, Hasanuddin
Keyvanfar, A.
Shafaghat, A.
Bakti, E. S.
author_sort Abd. Majid, Muhd. Zaimi
title Construction information systems for executive management in monitoring work progress
title_short Construction information systems for executive management in monitoring work progress
title_full Construction information systems for executive management in monitoring work progress
title_fullStr Construction information systems for executive management in monitoring work progress
title_full_unstemmed Construction information systems for executive management in monitoring work progress
title_sort construction information systems for executive management in monitoring work progress
publisher American Scientific Publishers
publishDate 2012
url http://eprints.utm.my/id/eprint/33019/
http://dx.doi.org/10.1166/asl.2012.4096
_version_ 1643649207901356032
score 13.209306