The restraints of performance bond claims in construction industry

Construction industry is full of uncertainties. It is a risky enterprise. Due to the recent problems of the construction industry, various bonds are required. Performance bond is used to guarantee performance of contract and protect the owner from financial loss due to the failure of the contractor...

Full description

Saved in:
Bibliographic Details
Main Author: Poh, Grace Chieng Ling
Format: Thesis
Language:English
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/32308/1/GracePohChiengLingMFAB2012.pdf
http://eprints.utm.my/id/eprint/32308/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Construction industry is full of uncertainties. It is a risky enterprise. Due to the recent problems of the construction industry, various bonds are required. Performance bond is used to guarantee performance of contract and protect the owner from financial loss due to the failure of the contractor to perform. It has held as a comprehensive and reliable instrument for minimizing the risks in construction projects. However there are some issues that may obstruct the real purpose of performance bond and restrained the performance bond claim. In Teknik Cekap Sdn Bhd v Public Bank Bhd, defective notice in calling performance bond had obstructed the real purpose of performance bond. Besides, in Edward Owen Engineering Ltd v Barclays Bank International Ltd and another, it stated that if there is clear fraud, the surety does not have to pay according to its guarantee. In Min Thai Holdings Pte Ltd v Sunlabel Pte Ltd & Anor, it also stated that unconscionability is another restraint of performance bond claims. These few case laws show that there are some circumstances that restrain performance bond claims. Therefore this research is conducted to identify the circumstances that restrain the performance bond claims in construction industry. This research is conducted by documentary analysis. In order to achieve the objective of this research, 16 Malaysia law cases which succeed in restraining the performance bond claim in construction industry are analyzed. These cases are Malayan Law Journal (MLJ) cases which are available in the database of Lexis Malaysia website. From the findings of this research, it can be concluded that the circumstances that restrain performance bond claims in construction industry are unconscionable conduct, prevention of irretrievable injustice, invalid demand, serious issues to be tried, balance of convenience, fraud, premature contract termination and no right to claim performance bond.