Cost comparison between IBS and conventional methods of construction

Saved in:
Bibliographic Details
Main Author: Ghasemabadi, Reza Lak
Format: Thesis
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/31973/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.31973
record_format eprints
spelling my.utm.319732013-06-12T07:51:12Z http://eprints.utm.my/id/eprint/31973/ Cost comparison between IBS and conventional methods of construction Ghasemabadi, Reza Lak Unspecified 2012 Thesis NonPeerReviewed Ghasemabadi, Reza Lak (2012) Cost comparison between IBS and conventional methods of construction. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic Unspecified
spellingShingle Unspecified
Ghasemabadi, Reza Lak
Cost comparison between IBS and conventional methods of construction
format Thesis
author Ghasemabadi, Reza Lak
author_facet Ghasemabadi, Reza Lak
author_sort Ghasemabadi, Reza Lak
title Cost comparison between IBS and conventional methods of construction
title_short Cost comparison between IBS and conventional methods of construction
title_full Cost comparison between IBS and conventional methods of construction
title_fullStr Cost comparison between IBS and conventional methods of construction
title_full_unstemmed Cost comparison between IBS and conventional methods of construction
title_sort cost comparison between ibs and conventional methods of construction
publishDate 2012
url http://eprints.utm.my/id/eprint/31973/
_version_ 1643648903471431680
score 13.211869