The challenges in implementing incentive based contract in Jabatan Kerja Raya project

Saved in:
Bibliographic Details
Main Author: Haryati Amzah, Nurrul Hudha
Format: Thesis
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/31570/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.31570
record_format eprints
spelling my.utm.315702013-05-07T03:28:34Z http://eprints.utm.my/id/eprint/31570/ The challenges in implementing incentive based contract in Jabatan Kerja Raya project Haryati Amzah, Nurrul Hudha Unspecified 2012 Thesis NonPeerReviewed Haryati Amzah, Nurrul Hudha (2012) The challenges in implementing incentive based contract in Jabatan Kerja Raya project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic Unspecified
spellingShingle Unspecified
Haryati Amzah, Nurrul Hudha
The challenges in implementing incentive based contract in Jabatan Kerja Raya project
format Thesis
author Haryati Amzah, Nurrul Hudha
author_facet Haryati Amzah, Nurrul Hudha
author_sort Haryati Amzah, Nurrul Hudha
title The challenges in implementing incentive based contract in Jabatan Kerja Raya project
title_short The challenges in implementing incentive based contract in Jabatan Kerja Raya project
title_full The challenges in implementing incentive based contract in Jabatan Kerja Raya project
title_fullStr The challenges in implementing incentive based contract in Jabatan Kerja Raya project
title_full_unstemmed The challenges in implementing incentive based contract in Jabatan Kerja Raya project
title_sort challenges in implementing incentive based contract in jabatan kerja raya project
publishDate 2012
url http://eprints.utm.my/id/eprint/31570/
_version_ 1643648799063670784
score 13.160551