Pareto analysis of on-site productivity constraints and improvement techniques in construction industry

Productivity represents efficient and effective utilisation of scarce resources to achieve set objectives. Based on Pareto principle, this study aims to identify the nature of and improvement measures for the 20% of the factors causing 80% of the on-site productivity problems in the New Zealand cons...

Full description

Saved in:
Bibliographic Details
Main Authors: Ismail, Syuhaida, Durdyev, Serdar
Format: Article
Published: Academic Journals 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/31121/
https://academicjournals.org/article/article1380807027_Durdyev%20and%20Ismail.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.31121
record_format eprints
spelling my.utm.311212018-11-30T06:24:52Z http://eprints.utm.my/id/eprint/31121/ Pareto analysis of on-site productivity constraints and improvement techniques in construction industry Ismail, Syuhaida Durdyev, Serdar TJ Mechanical engineering and machinery Productivity represents efficient and effective utilisation of scarce resources to achieve set objectives. Based on Pareto principle, this study aims to identify the nature of and improvement measures for the 20% of the factors causing 80% of the on-site productivity problems in the New Zealand construction industry. Qualitative data collected using pilot interviews formed the basis for questionnaire surveys of project managers, contractors and subcontractors in New Zealand. The quantitative data was analysed using the multi-attribute method and Pareto analysis. Results showed that the factors influencing on-site productivity comprise (in order of influence): project management/project team characteristics, project finance/cash flow, workforce characteristics, project design/characteristics, unforeseen events, technology/process, statutory compliance and wider external forces. Overall, it was found that the way a project is managed, financed and managed, coupled with the workforce and project characteristics, account for the bulk of the on-site productivity problems encountered during its implementation. The levels of impact and occurrence frequencies of the variables under the broad factor categories are reported; these are recommended as guide to optimal utilization of the available resources in addressing the constraints with a view to achieving significant on-site productivity improvement. Academic Journals 2012-02 Article PeerReviewed Ismail, Syuhaida and Durdyev, Serdar (2012) Pareto analysis of on-site productivity constraints and improvement techniques in construction industry. Journal of Scientific Research and Essay, 7 (4). pp. 1-10. ISSN 1992-2248 https://academicjournals.org/article/article1380807027_Durdyev%20and%20Ismail.pdf
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
Ismail, Syuhaida
Durdyev, Serdar
Pareto analysis of on-site productivity constraints and improvement techniques in construction industry
description Productivity represents efficient and effective utilisation of scarce resources to achieve set objectives. Based on Pareto principle, this study aims to identify the nature of and improvement measures for the 20% of the factors causing 80% of the on-site productivity problems in the New Zealand construction industry. Qualitative data collected using pilot interviews formed the basis for questionnaire surveys of project managers, contractors and subcontractors in New Zealand. The quantitative data was analysed using the multi-attribute method and Pareto analysis. Results showed that the factors influencing on-site productivity comprise (in order of influence): project management/project team characteristics, project finance/cash flow, workforce characteristics, project design/characteristics, unforeseen events, technology/process, statutory compliance and wider external forces. Overall, it was found that the way a project is managed, financed and managed, coupled with the workforce and project characteristics, account for the bulk of the on-site productivity problems encountered during its implementation. The levels of impact and occurrence frequencies of the variables under the broad factor categories are reported; these are recommended as guide to optimal utilization of the available resources in addressing the constraints with a view to achieving significant on-site productivity improvement.
format Article
author Ismail, Syuhaida
Durdyev, Serdar
author_facet Ismail, Syuhaida
Durdyev, Serdar
author_sort Ismail, Syuhaida
title Pareto analysis of on-site productivity constraints and improvement techniques in construction industry
title_short Pareto analysis of on-site productivity constraints and improvement techniques in construction industry
title_full Pareto analysis of on-site productivity constraints and improvement techniques in construction industry
title_fullStr Pareto analysis of on-site productivity constraints and improvement techniques in construction industry
title_full_unstemmed Pareto analysis of on-site productivity constraints and improvement techniques in construction industry
title_sort pareto analysis of on-site productivity constraints and improvement techniques in construction industry
publisher Academic Journals
publishDate 2012