Load shedding scheme in large pulp mill by using analytic hierarchy process

Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. In particular, the breakdown of the generator would cause other generators to be overloaded. Thus, load shedding scheme is the best way in handling such condition. Selected load will be shed under t...

Full description

Saved in:
Bibliographic Details
Main Authors: Goh, H. H., Kok, B. C., Lee, S. W., Mohd. Zin, Abdullah Asuhaimi
Format: Book Section
Published: American Institute of Physics 2011
Subjects:
Online Access:http://eprints.utm.my/id/eprint/29257/
http://dx.doi.org/10.1063/1.3592443
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.29257
record_format eprints
spelling my.utm.292572017-02-04T07:33:04Z http://eprints.utm.my/id/eprint/29257/ Load shedding scheme in large pulp mill by using analytic hierarchy process Goh, H. H. Kok, B. C. Lee, S. W. Mohd. Zin, Abdullah Asuhaimi TK Electrical engineering. Electronics Nuclear engineering Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. In particular, the breakdown of the generator would cause other generators to be overloaded. Thus, load shedding scheme is the best way in handling such condition. Selected load will be shed under this scheme in order to protect the generators from being damaged. In the meantime, the subsequence loads will be shed until the generators are sufficient to provide the power to other loads. In order to determine the sequences of load shedding scheme, analytic hierarchy process (AHP) is introduced. Analytic Hierarchy Process is one of the multi-criteria decision making methods. By using this method, the priority of the load can be determined. This paper presents the theory of the alternative methods to choose the load priority in load shedding scheme for a large pulp mill. American Institute of Physics 2011 Book Section PeerReviewed Goh, H. H. and Kok, B. C. and Lee, S. W. and Mohd. Zin, Abdullah Asuhaimi (2011) Load shedding scheme in large pulp mill by using analytic hierarchy process. In: AIP Conference Proceedings. American Institute of Physics, pp. 57-64. ISBN 978-073540893-7 http://dx.doi.org/10.1063/1.3592443 10.1063/1.3592443
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Goh, H. H.
Kok, B. C.
Lee, S. W.
Mohd. Zin, Abdullah Asuhaimi
Load shedding scheme in large pulp mill by using analytic hierarchy process
description Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. In particular, the breakdown of the generator would cause other generators to be overloaded. Thus, load shedding scheme is the best way in handling such condition. Selected load will be shed under this scheme in order to protect the generators from being damaged. In the meantime, the subsequence loads will be shed until the generators are sufficient to provide the power to other loads. In order to determine the sequences of load shedding scheme, analytic hierarchy process (AHP) is introduced. Analytic Hierarchy Process is one of the multi-criteria decision making methods. By using this method, the priority of the load can be determined. This paper presents the theory of the alternative methods to choose the load priority in load shedding scheme for a large pulp mill.
format Book Section
author Goh, H. H.
Kok, B. C.
Lee, S. W.
Mohd. Zin, Abdullah Asuhaimi
author_facet Goh, H. H.
Kok, B. C.
Lee, S. W.
Mohd. Zin, Abdullah Asuhaimi
author_sort Goh, H. H.
title Load shedding scheme in large pulp mill by using analytic hierarchy process
title_short Load shedding scheme in large pulp mill by using analytic hierarchy process
title_full Load shedding scheme in large pulp mill by using analytic hierarchy process
title_fullStr Load shedding scheme in large pulp mill by using analytic hierarchy process
title_full_unstemmed Load shedding scheme in large pulp mill by using analytic hierarchy process
title_sort load shedding scheme in large pulp mill by using analytic hierarchy process
publisher American Institute of Physics
publishDate 2011
url http://eprints.utm.my/id/eprint/29257/
http://dx.doi.org/10.1063/1.3592443
_version_ 1643648259844997120
score 13.18916