Pengawalan kos projek pembinaan oleh kontraktor

Cost control in construction project is very important besides the technical knowledge in construction. Poor cost control may lead to reduced profit margin or total loss to the contractor. Making profit is the contractors? main aim when undertaking the project. However good financial and cost contro...

Full description

Saved in:
Bibliographic Details
Main Author: Abdul Rahman, Mohamad Sofiuddin
Format: Thesis
Language:English
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/28769/5/MohammadSofiuddinAbdulMFKA2012.pdf
http://eprints.utm.my/id/eprint/28769/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.28769
record_format eprints
spelling my.utm.287692018-04-30T13:09:30Z http://eprints.utm.my/id/eprint/28769/ Pengawalan kos projek pembinaan oleh kontraktor Abdul Rahman, Mohamad Sofiuddin T Technology (General) TA Engineering (General). Civil engineering (General) Cost control in construction project is very important besides the technical knowledge in construction. Poor cost control may lead to reduced profit margin or total loss to the contractor. Making profit is the contractors? main aim when undertaking the project. However good financial and cost control will lead to maximum profit for the contractors? organization. The objectives of this study are to identify the cost control methods used by the contractor in the construction project, to identify the factors considered by the contractor to determine the profit margin and to identify the strategy used by the contractor to reduce the financial risk in the construction project The study is carried out through literature review and questionnaires. The data is analyzed using average index. From the study, the cost control method used by the contractors for monitoring and controlling the cost construction project are using loss or profit based on payment every month method, loss or profit based on payment every completion the element method, loss or profit based on payment after finish every work method, loss or profit based on payment every stage method and loss or profit based on payment after completion of project method. The factors considered by the contractor to determine the profit margin are; the complexity of the project, the risks involved, types of project, inflation, current workload, completion date and competition. The strategy used by the contractor to reduce the financial risk in the construction project are; understanding geographical area, project size depends on financial standing, credit purchasing, prudent management, preparing monthly cash flow, overall planning and continuous project monitoring. 2012-01 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/28769/5/MohammadSofiuddinAbdulMFKA2012.pdf Abdul Rahman, Mohamad Sofiuddin (2012) Pengawalan kos projek pembinaan oleh kontraktor. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic T Technology (General)
TA Engineering (General). Civil engineering (General)
spellingShingle T Technology (General)
TA Engineering (General). Civil engineering (General)
Abdul Rahman, Mohamad Sofiuddin
Pengawalan kos projek pembinaan oleh kontraktor
description Cost control in construction project is very important besides the technical knowledge in construction. Poor cost control may lead to reduced profit margin or total loss to the contractor. Making profit is the contractors? main aim when undertaking the project. However good financial and cost control will lead to maximum profit for the contractors? organization. The objectives of this study are to identify the cost control methods used by the contractor in the construction project, to identify the factors considered by the contractor to determine the profit margin and to identify the strategy used by the contractor to reduce the financial risk in the construction project The study is carried out through literature review and questionnaires. The data is analyzed using average index. From the study, the cost control method used by the contractors for monitoring and controlling the cost construction project are using loss or profit based on payment every month method, loss or profit based on payment every completion the element method, loss or profit based on payment after finish every work method, loss or profit based on payment every stage method and loss or profit based on payment after completion of project method. The factors considered by the contractor to determine the profit margin are; the complexity of the project, the risks involved, types of project, inflation, current workload, completion date and competition. The strategy used by the contractor to reduce the financial risk in the construction project are; understanding geographical area, project size depends on financial standing, credit purchasing, prudent management, preparing monthly cash flow, overall planning and continuous project monitoring.
format Thesis
author Abdul Rahman, Mohamad Sofiuddin
author_facet Abdul Rahman, Mohamad Sofiuddin
author_sort Abdul Rahman, Mohamad Sofiuddin
title Pengawalan kos projek pembinaan oleh kontraktor
title_short Pengawalan kos projek pembinaan oleh kontraktor
title_full Pengawalan kos projek pembinaan oleh kontraktor
title_fullStr Pengawalan kos projek pembinaan oleh kontraktor
title_full_unstemmed Pengawalan kos projek pembinaan oleh kontraktor
title_sort pengawalan kos projek pembinaan oleh kontraktor
publishDate 2012
url http://eprints.utm.my/id/eprint/28769/5/MohammadSofiuddinAbdulMFKA2012.pdf
http://eprints.utm.my/id/eprint/28769/
_version_ 1643648157432676352
score 13.153044