The built then sell (bts) system in housing industry : obstacles to its implementation in Selangor

The Built then Sell (BTS) system has been an issue in the housing industry since its introduction in 2007. The system was offered as an option to developers due to several problems regarding its implementation. Several developers have opted to use this system in their housing project. Hence, the stu...

Full description

Saved in:
Bibliographic Details
Main Author: Yakob, Hamizah
Format: Thesis
Published: 2010
Subjects:
Online Access:http://eprints.utm.my/id/eprint/26433/
http://libraryopac.utm.my/client/en_AU/main/search/results?qu=The+built+then+sell+%28bts%29+system+in+housing+industry+%3A+obstacles+to+its+implementation+in+Selangor&te=
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.26433
record_format eprints
spelling my.utm.264332017-08-24T03:36:37Z http://eprints.utm.my/id/eprint/26433/ The built then sell (bts) system in housing industry : obstacles to its implementation in Selangor Yakob, Hamizah Unspecified The Built then Sell (BTS) system has been an issue in the housing industry since its introduction in 2007. The system was offered as an option to developers due to several problems regarding its implementation. Several developers have opted to use this system in their housing project. Hence, the study focused on the approach used by these developers in implementing BTS system and problems encountered during its implementation. The aim of the study is to identify the obstacles that prevent the implementation of BTS system in Selangor. Three objectives were identified for the study which was, 1) to identify the influence of mechanisms in the implementation of BTS system, 2) to identify the influence of incentives in the implementation of BTS system and 3) to identify the influence of financing in implementing the implementation of BTS system. A case study approach was used in the study. Three case studies were selected in the study due lack of involvement of developer in BTS project. The transcript texts of the taped interview from the case study were compared and interpreted in terms of mechanism, incentives and financing. It was indicated that unclear policy and procedures, lack of rules and regulations, lack of coordination between administrative levels and lack of awareness among home buyers are problems of the existing mechanisms in the BTS implementation. It was further indicate that unattractive and insufficient of provided incentives as well as unskilled, lacking of staff and bureaucratic red tape are problems regarding the incentives. It was identified that lack of financial facilities, misunderstanding of the system and stricter terms and conditions are problems in obtaining bridging finance for BTS projects. Hence, internal funding used to replace end financing under the system. The findings may carry a few implications for the improvement of housing delivery system and parties involved in the housing industry in Malaysia. 2010 Thesis NonPeerReviewed Yakob, Hamizah (2010) The built then sell (bts) system in housing industry : obstacles to its implementation in Selangor. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment. http://libraryopac.utm.my/client/en_AU/main/search/results?qu=The+built+then+sell+%28bts%29+system+in+housing+industry+%3A+obstacles+to+its+implementation+in+Selangor&te=
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic Unspecified
spellingShingle Unspecified
Yakob, Hamizah
The built then sell (bts) system in housing industry : obstacles to its implementation in Selangor
description The Built then Sell (BTS) system has been an issue in the housing industry since its introduction in 2007. The system was offered as an option to developers due to several problems regarding its implementation. Several developers have opted to use this system in their housing project. Hence, the study focused on the approach used by these developers in implementing BTS system and problems encountered during its implementation. The aim of the study is to identify the obstacles that prevent the implementation of BTS system in Selangor. Three objectives were identified for the study which was, 1) to identify the influence of mechanisms in the implementation of BTS system, 2) to identify the influence of incentives in the implementation of BTS system and 3) to identify the influence of financing in implementing the implementation of BTS system. A case study approach was used in the study. Three case studies were selected in the study due lack of involvement of developer in BTS project. The transcript texts of the taped interview from the case study were compared and interpreted in terms of mechanism, incentives and financing. It was indicated that unclear policy and procedures, lack of rules and regulations, lack of coordination between administrative levels and lack of awareness among home buyers are problems of the existing mechanisms in the BTS implementation. It was further indicate that unattractive and insufficient of provided incentives as well as unskilled, lacking of staff and bureaucratic red tape are problems regarding the incentives. It was identified that lack of financial facilities, misunderstanding of the system and stricter terms and conditions are problems in obtaining bridging finance for BTS projects. Hence, internal funding used to replace end financing under the system. The findings may carry a few implications for the improvement of housing delivery system and parties involved in the housing industry in Malaysia.
format Thesis
author Yakob, Hamizah
author_facet Yakob, Hamizah
author_sort Yakob, Hamizah
title The built then sell (bts) system in housing industry : obstacles to its implementation in Selangor
title_short The built then sell (bts) system in housing industry : obstacles to its implementation in Selangor
title_full The built then sell (bts) system in housing industry : obstacles to its implementation in Selangor
title_fullStr The built then sell (bts) system in housing industry : obstacles to its implementation in Selangor
title_full_unstemmed The built then sell (bts) system in housing industry : obstacles to its implementation in Selangor
title_sort built then sell (bts) system in housing industry : obstacles to its implementation in selangor
publishDate 2010
url http://eprints.utm.my/id/eprint/26433/
http://libraryopac.utm.my/client/en_AU/main/search/results?qu=The+built+then+sell+%28bts%29+system+in+housing+industry+%3A+obstacles+to+its+implementation+in+Selangor&te=
_version_ 1643647771444510720
score 13.160551