The study to optimize the payback period for PV installation in Malaysia

Saved in:
Bibliographic Details
Main Author: Ardianshah, Mohammad Shahril
Format: Thesis
Published: 2009
Subjects:
Online Access:http://eprints.utm.my/id/eprint/18575/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.18575
record_format eprints
spelling my.utm.185752011-11-18T04:35:28Z http://eprints.utm.my/id/eprint/18575/ The study to optimize the payback period for PV installation in Malaysia Ardianshah, Mohammad Shahril TK Electrical engineering. Electronics Nuclear engineering 2009 Thesis NonPeerReviewed Ardianshah, Mohammad Shahril (2009) The study to optimize the payback period for PV installation in Malaysia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Electrical Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Ardianshah, Mohammad Shahril
The study to optimize the payback period for PV installation in Malaysia
format Thesis
author Ardianshah, Mohammad Shahril
author_facet Ardianshah, Mohammad Shahril
author_sort Ardianshah, Mohammad Shahril
title The study to optimize the payback period for PV installation in Malaysia
title_short The study to optimize the payback period for PV installation in Malaysia
title_full The study to optimize the payback period for PV installation in Malaysia
title_fullStr The study to optimize the payback period for PV installation in Malaysia
title_full_unstemmed The study to optimize the payback period for PV installation in Malaysia
title_sort study to optimize the payback period for pv installation in malaysia
publishDate 2009
url http://eprints.utm.my/id/eprint/18575/
_version_ 1643646939882848256
score 13.214268